Advertisement

Power Distribution
7.3.2.3
Installation options for 600 mm wide symmetrical racks
Rack height
Installation direction vertically
42 HU
Not possible
24 HU
Not possible
16 HU
Not possible
Table 7: Installation options for 600 mm wide symmetrical racks
Performing the task
Ê Install the socket strip onto the PDU kit 3 HU as described on
Figure 48: 10-way socket strip "Blade PDU" mounted in a 600 mm wide symmetrical rack
Ê Install the PDU kit 3 HU in the required height into the rack.
I
The PDU kit 3 HU may only be mounted from HU 7 upwards.
80
Installation direction horizontally
Max. 2x with PDU kit 3 HU
Max. 2x with PDU kit 3 HU
Max. 2x with PDU kit 3 HU