Fujitsu Remote Management User Manual page 190

Serverview suite irmc s2/s3 - integrated remote management controller
Table of Contents

Advertisement

Power Management
Power Cycle
Powers the server down completely and then powers it up again after a
configured period. You can configure this time in the Power Cycle Delay
field of the ASR&R Options group (see
Graceful Power Off (Shutdown)
Graceful shutdown and power off.
This option is only available if ServerView agents are installed and
signed onto the iRMC S2/S3 as "Connected".
Graceful Reset (Reboot)
Graceful shutdown and reboot.
This option is only available if ServerView agents are installed and
signed onto the iRMC S2/S3 as "Connected".
Ê Click Apply to start the required action.
190
page
234).
iRMC S2/S3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents