ASSEMBLY
TOOLS REQUIRED FOR ASSEMBLY
1 - Knife (to cut carton and plastic ties)
2 - 112inch wrenches (or adjustable wrenches)
2 - 9/16 inch wrenches (or adjustable wrenches)
2 - 3/4 inch wrenches (or adjustable wrenches)
1 - Pliers (to spread cotter pin)
1- Screwdriver
1 - Measuring Tape or Ruler
FIG. 1 shows the snow thrower in the shippingposition.
FIG. 2 shows the snow thrower completely assembled.
Reference to the right and left hand side of the snow
thrower is from the operator'spositionat the handle.
TO REMOVE SNOW THROWER
FROM CARTON (See FIG. 1)
•
Locate and remove container of 5W30 oil.
•
Locate the crank assembly and place the assembly
aside.
•
Remove and discardthepacking materialfromaround
snow thrower.
•
Cut all four comers of the carton from top to bottom
and lay the panels flat.
•
Cut ties securing the clutch control cable to the lower
handle and lay cable back away from the motor frame.
•
Roll the snowthrower off the carton by pulling on the
lower handle. CAUTION: DO NOT back over cable.
•
To complete upper handle installation and install
chute crank assembly, (See To Install The Upper
Handle and Crank Assembly paragraph on page
8).
NOTE: if the cables have become disconnectedfrom the
clutch lever, reinstall the cables as shown in FIG. 3 and
FIG. 3A.
AUGER
LEVER
CLUTCH
FIG. 2
CRANK
}LY
DEFLECTOR
AUGER
DRIVE
LEVER
FITTING
LOWER HANDLE
FIG. 1
CLUTCH
CABLE
UPPER
SSEMBLY
FIG. 3
AUGER DRIVE SPRING
FIG. 3A
7