Bolting Cabinets Together

NOTE
UPS wiring must be completed before the cabinets are bolted together.
1. Line up cabinets so that mounting holes are aligned.
2. Using supplied hardware, bolt the cabinets together. The bolts may be inserted from either the
UPS side or from the MBS side, whichever is more convenient.
Place cabinets so mounting holes are
aligned.
A bolt from the adjacent cabinet may be
screwed into the threaded top hole, or a
bolt may be inserted through the lower
hole and screwed into the threaded hole
in the adjacent cabinet.