Commissioning - Duerkopp Adler 745-34 Installation Instructions Manual

Sewing unit for runstitching of piped flap and welt pocket openings and pocket corners working methods: a, b, d, f
Table of Contents

Advertisement

9.

Commissioning

22
After completion of the installation work a sewing test should be made.
Plug in the mains plug.
Caution: Danger of injury !
Switch off the main switch before threading in the needle and hook
thread.
Laser light.
Do not look into the light source.
Thread in the needle thread (see Operating Instructions,
chapter 2.5).
Thread in the hook thread (see Operating Instructions,
chapter 2.8).
Switch on the main switch.
The control is initialized.
The DÜRKOPP-ADLER logo briefly appears in the display of the
control panel.
Step back on the left pedal.
The reference run starts.
The transport carriage moves in its rear end position.
The reference run is necessary in order to get a defined initial
position of the transport carriage.
The display changes to the main screen of the sewing unit.
By actuating the left pedal the various steps of the positioning
procedure are triggered sequentially and the sewing cycle is
started.
The individual steps are dependent on the working method and the
equipment of the sewing unit.
ATTENTION !
At the sewing start the workpiece must lie under the feeding clamps.
Movement of the transport carriage without material damages the
coating of the feeding clamps.
For selecting the sewing program and for the further settings of the
control unit see Part 4: Programming Instructions 745-34.
Positioning and operation are described in Part 1: Operating
Instructions 745-34.