6 ] Installing The Frame Assy - Brother P-touch PT-1180 Service Manual

Hide thumbs Also See for P-touch PT-1180:
Table of Contents

Advertisement

[ 6 ]
Installing the frame ASSY
(1)
Install the cutter lever into the bottom cover.
(2)
If the frame ASSY has been disassembled, assemble the components by referring to the
next page.
(3)
The frame ASSY is set by matching the locating pin and the locating boss of the bottom
cover.
(4)
The main frame is installed on the bottom cover with 3 screws. The FG harness of sub PCB
Assy is secured to the frame Assy, at this point, with screws of "A".
Note: Install the frame ASSY so that the FG harness terminal (metallic section) does not contact
with sub PCB.
(5)
Solder the motor harness to the sub PCB.
Note: Be careful to the direction of the motor harness (+), (-) and not to stick out from the
designated place when soldering.
Tightening torque: 0.39 N . m (4 kg . cm)
Motor harnesses
Sub PCB
Soldering
Screws
FG harness
"A"
Locating boss
Bottom cover
Fig. 2.2-23 Installing the Cutter Lever and the Frame ASSY
Red
II-
22
Frame ASSY
Locating pin
Motor harnesses
Black
Soldering
Cutter lever

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents