3 ] Installing The Sub Pcb - Brother P-touch PT-1180 Service Manual

Hide thumbs Also See for P-touch PT-1180:
Table of Contents

Advertisement

[ 3 ]
Installing the sub PCB
(1)
Relay harness is solder connected to the sub PCB.
(2)
After pushing the "A" section of battery terminal (+) of sub PCB ASSY, perform the wiring.
(Refer to Fig. 2.2-20)
(3)
Set the sub PCB into the locating pin and AC jack groove, and tighten the screw, confirming
that each of the sensor switch actuators is fitted into the hole of the bottom cover certainly
and moves up and down freely.
Tightening torque: 0.29 N . m (3 kg . cm)
Note1: Make sure that the battery terminal does not run on the VR1.
Note2: The AC jack is not provided for PT-1180. Therefore the form of the bottom cover is slightly
different from the figure below, and the AC jack groove is also not provided.
Main PCB
Relay harness
Sub PCB
AC jack
AC jack groove
Pin
Fig. 2.2-19 Installing the Sub PCB
FG harness
VR1
"A"
Fig. 2.2-20 Details of Battry Terminal (+)
Screw
Sensor switch (Actuator)
Battry terminal (+)
Battery terminal (-)
II-
20
Bottom cover
Relay harness

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents