Step 1 Plan Your System; Step 2 Check Outlet Grounding - Lucent Technologies SPIRIT 1224 Controller Customer Installation Instructions Manual

Communications system
Hide thumbs Also See for SPIRIT 1224 Controller:
Table of Contents

Advertisement

Step 1 Plan Your System

Draw a floor plan of your business, showing the location of the network interface jacks,
where your local telephone lines come into the building or office. Install your controller
close to these jacks. Be sure an AC outlet not controlled by a switch is available.
Show on the floor plan the location of each telephone in your system and the distances of
the wiring run from the controller to each telephone location.
Below is a sample floor plan to guide you in making your own floor plan.
NOTE: If you need to install SPIRIT Commmunications System telephones in another building,
but not more than 1000 feet from the controller, an in-range, out-of-building (IROB) pro-
tection device is required. Contact your AT&T representative and order part number 31304.
INCOMING TELEPHONE LINE
(also called Network Interface Jacks)
NOTE: Be sure cords do not cross hallways. Do not run cords inside air plenums and ducts or
along hot pipes.

Step 2 Check Outlet Grounding

Your SPIRIT Communications System control unit has been protected against AC line
and central office line voltage surges caused by lightning strikes or other power
anomalies, provided the system is properly grounded.
Using a circuit tester, check (or have checked by a qualified technician) the outlet into
which your SPIRIT system control unit will be plugged. If the circuit tester detects
any of these faults, have this corrected before installation of the control unit:
— open ground
— reversed polarity
— open hot
If necessary, have a qualified electrician repair the electrical outlet in the manner
specified by the applicable electrical codes to prevent service interruption and continue
warranty protection. If you have two-wire outlets with no ground wire, a non-switched,
three-wire grounded outlet should be installed.
2
Set 15 75'
Set 10 30'
Set 16 90'
Set 11 40'
Set 17 105'
Set 12 50'
Set 18 120'
Set 13 60'
Set 19 45'
Set 14 30'
— open neutral
— hot and ground reversed
— hot on neutral with hot open
Set 25 170'
Set 20 100'
Set 26 115'
Set 21 90'
Set 27 100'
Set 22 105'
Set 23 130'
Set 24 150'

Advertisement

Table of Contents
loading

This manual is also suitable for:

Spirit 2448

Table of Contents