3. PREPARATION
3-7. Installing the spool stand
Install the spool stand (1) to the table.
(1)
0073Q
3-8. Installing the programmer (option)
[Flat]
[Vertical]
(1)
(1)
(2)
(1)
(2)
(2)
(4)
(3)
1181S
1182S
1183S
1. Install the programmer support (2) to the work table with the two screws (1).
2. Insert the programmer connector (4) securely into the left side of the operation panel (3).
BAS-341F, 342F
6