Installing Power Supplies - Cisco AJ732A - MDS 9134 Fabric Switch Installation Manual

Cisco mds 9100 series hardware installation guide (ol-17951-02, february 2009)
Hide thumbs Also See for AJ732A - Cisco MDS 9134 Fabric Switch:
Table of Contents

Advertisement

Chapter 2
Installing the Cisco MDS 9100 Series
S e n d d o c u m e n t a t i o n c o m m e n t s t o m d s f e e d b a c k - d o c @ c i s c o . c o m
Figure 2-24
DC input
terminals
Status LEDs

Installing Power Supplies

To install the 300-W DC-input power supplies, follow these steps:
Step 1
Ensure that the system (earth) ground connection has been made.
Step 2
Slide the power supply into the power supply bay. Make sure that the power supply is fully seated in the
bay. The input LED is green and indicates an OK condition, but the output LED is red.
Switch off the DC power source and switch it on again.
Step 3
Step 4
Ensure that the output LED is green.
The switch can now receive the down converted 12 VDC from the inserted DC power supply.
Tighten the power supply captive screw.
Step 5
Note
Step 6
Verify power supply operation by checking that the power supply (P/S) LED in the front panel is green.
If the LED is not green, see the Cisco MDS 9000 Family Troubleshooting Guide.
OL-17951-02
Cisco MDS 9100 Series DC Power Supply
Handle
Depending on the outlet receptacle on your power distribution unit, you may need the optional
jumper power cord to connect the Cisco MDS 9100 Series switch to your outlet receptacle. See
the
"Jumper Power Cord" section on page
Removing and Installing Components
C-5.
Cisco MDS 9100 Series Hardware Installation Guide
2-31

Advertisement

Table of Contents
loading

Table of Contents