Asus RS920-E7/RS8 User Manual page 28

2u rackmount server
Hide thumbs Also See for RS920-E7/RS8:
Table of Contents

Advertisement

8.
Push down the right load lever (J),
ensuring that the edge of the load
plate is fixed by the lever (K).
9.
Insert the right load lever under the
retention tab.
10. Push down the left load lever (L),
and then insert the lever under the
retention tab (M).
2-6
J
M
L
Chapter 2: Hardware setup
K

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rs926-e7/rs8

Table of Contents