Asus RS920-E7/RS8 User Manual page 26

2u rackmount server
Hide thumbs Also See for RS920-E7/RS8:
Table of Contents

Advertisement

2.
Press the left load lever with your
thumb (A), then move it to the left
(B) until it is released from the
retention tab.
To prevent damage to the socket
pins, do not remove the PnP cap
unless you are installing a CPU.
3.
Slightly lift the load lever in the
direction of the arrow.
4.
Press the right load lever with your
thumb (C), then move it to the right
(D) until it is released from the
retention tab. Lift the load lever in
the direction of the arrow (E).
2-4
A
B
Load lever
C
Chapter 2: Hardware setup
E
D

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rs926-e7/rs8

Table of Contents