10. Click Upgrade Firmware/Configuration.
11. Click Browse; then, select the firmware update file that you obtained in step 1.
12. Click Start; then, click Yes to confirm each time you are asked a question.
13. Close the Web browser.
14. Complete the following steps to restart the I/O module:
Configuring the Nortel Networks Layer 2-7 GbE Switch Module for IBM
BladeCenter
Complete the following steps to update the firmware of the Nortel Networks Layer
2-7 GbE Switch Module for IBM BladeCenter. No configuration is required for the
Nortel Networks Layer 2-7 GbE Switch Module for IBM BladeCenter to enable
SOL.
Notes:
v You will not be able to perform this procedure if the values for the network
v These steps require that an accessible TFTP (Trivial FTP) server is present on
1. Obtain the latest version of Nortel Networks Layer 2-7 GbE Switch Module for
2. Update the Nortel Networks Layer 2-7 GbE Switch Module for IBM
in the same subnet, you must modify them before you continue. See
"Configuring the management module" on page 9 for information.
5. Scroll to the Bay 1 (Ethernet SM)* section; then, click Advanced
Management.
6. Scroll to the Start Telnet/Web Session section; then, click Start Web Session.
This will start a new Web browser session and connect to the IBM 4-Port Gb
Ethernet Switch Module for BladeCenter Web interface.
7. Log in to the IBM 4-Port Gb Ethernet Switch Module for BladeCenter Web
interface.
8. Click Maintenance.
9. Click Using Browser.
a. In the navigation pane, click I/O Module Tasks → Admin/Power/Restart.
b. Select your IBM 4-Port Gb Ethernet Switch Module for BladeCenter and
click Restart Module(s) and Run Standard Diagnostics.
c. Click OK to confirm.
configuration of the Nortel Networks Layer 2-7 GbE Switch Module for IBM
BladeCenter are not within the same subnet as the BladeCenter
management-module network interfaces (eth0 and eth1). See "Configuring the
management module" on page 9 for information.
your production network.
IBM BladeCenter firmware from http://www.ibm.com/support/.
BladeCenter firmware, following the instructions that come with the update file
that you downloaded. The Nortel Networks Layer 2-7 GbE Switch Module has
multiple firmware images. These images must all be updated, in the correct
order. Make sure that you restart the Nortel Networks Layer 2-7 GbE Switch
Module after updating each firmware image.