Installing A Microprocessor And Heat Sink - IBM HC10 - BladeCenter - 7996 Service Manual

Problem determination and service guide
Hide thumbs Also See for HC10 - BladeCenter - 7996:
Table of Contents

Advertisement

Installing a microprocessor and heat sink

To install a microprocessor and heat sink, complete the following steps.
Attention:
pins might result in permanent damage to the system board.
1. Install the microprocessor:
34
BladeCenter HC10 Type 7996: Problem Determination and Service Guide
Do not touch the pins in the microprocessor socket. Touching these
Attention:
Do not use any tools or sharp objects to lift the locking lever on the
microprocessor socket. Doing so might result in permanent damage to the
system board.
Microprocessor
retainer
a. Make sure the locking lever on the microprocessor socket from its closed
and locked position until it stops in the fully open position (approximately a
130° angle), as shown.
b. Make sure the microprocessor retainer on the microprocessor socket from is
in the fully open position (approximately a 100° angle), as shown.
c. Touch the static-protective package that contains the microprocessor to any
unpainted metal surface on the BladeCenter unit or any unpainted metal
surface on any other grounded rack component; then, remove the
microprocessor from the package.
d. Remove the cover from the bottom of the microprocessor.
Microprocessor
Microprocessor retainer
Heat Sink
Microprocessor
Microprocessor
release lever
Alignment marks
Microprocessor
socket

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bladecenter hc10 type 7996

Table of Contents