NETGEAR SW518 - Switch Installation Manual page 36

Installation guide
Hide thumbs Also See for SW518 - Switch:
Table of Contents

Advertisement

Installation Guide for the Model SW510 and Model SW518 Ethernet Switches
Table B-1 lists the pin assignments for the RJ-45 plug and the vista RJ-45 connector.
Table 5-1.
connector
Pin
Normal assignment
1
Input Receive Data +
2
Input Receive Data –
3
Output Transmit Data +
6
Output Transmit Data –
4, 5, 7, 8
Not Used
B-2
Pin assignments for the RJ-45 plug and vista RJ-45
Uplink assignment
Output Transmit Data +
Output Transmit Data –
Input Receive Data +
Input Receive Data –
Not Used
Connector Pin Assignments

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sw510

Table of Contents