Download Print this page

Field Controls 46294900 Manual

Control kit

Advertisement

Quick Links

CONTROL KIT
Relay
P/N 46126600
Designed for controlling oil fired heating appliances using a
Honeywell R8184G or equivalent Primary Control. The control
operates the burner motor and the power venter together. A
solenoid valve is used to control burner operation.
I
K
TEMS INCLUDED IN
IT
1 - Junction box with mounted pressure switch and and solid state post
purge control
1 - WMO-1 Secondary Safety Switch
1 - Delay oil solenoid valve with preset pre-purge
1 - 2 ft. length of 1/4 inch aluminum tubing
2 - Flexible conduit connector
1 - 1/4 inch tubing connector
Model: CK-65
Aluminum Tubing
:
2630 Airport Road • Kinston, NC 28504
Phone: 252-522-3031 • FAX: 252-522-0214
www.fieldcontrols.com
Timer
P/N 46144700
WMO-1 Safety Kit
P/N 46086901

Advertisement

loading

Summary of Contents for Field Controls 46294900

  • Page 1 CONTROL KIT Model: CK-65 Timer P/N 46144700 Aluminum Tubing WMO-1 Safety Kit Relay P/N 46086901 P/N 46126600 Designed for controlling oil fired heating appliances using a Honeywell R8184G or equivalent Primary Control. The control operates the burner motor and the power venter together. A solenoid valve is used to control burner operation.
  • Page 2: Installation And Adjustments

    INSTALLATION AND ADJUSTMENTS OUNTING UNCTION The junction box can be mounted at the venter or remotely mounted away from the venter. (See Fig. 1 & Fig. 2) 1. Remove one of the knockouts from the side of the junction box where the pressure switch is mounted. Install the flexible conduit connector onto the CK-65 junction box and secure with fastening nut.
  • Page 3: Wiring Instructions

    RESSURE WITCH ENSING NSTALLATION 1. Attach the 1/4 inch tubing connector to the pressure tube on the SWG Venter. (See Fig. 3) 2. Connect the supplied 1/4" aluminum tubing to the tubing connector. Route the tubing to the CK-65 junction box and connect the tubing to the pressure switch.
  • Page 4 Wiring Diagram A Wiring Diagram B Typical Wiring With Phelon Control Page 4...
  • Page 5: Troubleshooting Hints

    YSTEM ONTROL HECK ROCEDURES 1. Adjust the thermostat to call for heat and observe the power venting system for proper operation sequence. (Repeat if necessary) a. Thermostat calls for heat. b. Relay is energized and venter motor starts. c. Pressure switch closes and burner starts. d.
  • Page 6 DO NOT DESTROY HESE NSTRUCTIONS EMAIN QUIPMENT Installation Information Model No.: ___________________________________ Installer’s Name: ______________________________ Installer’s Company:____________________________ Phone No.: ___________________________________ Date of Installation: ____________________________ Page 6...
  • Page 7 Page 7...
  • Page 8 P/N 46294900 Rev A 05/00 Page 8...

This manual is also suitable for:

Ck-65