Chapter 7
NPE-G1 and NPE-G2 Installation and Configuration Information
Reconnecting AC-Input Power to the Cisco uBR7246VXR Router
Figure 7-25
2
3
1
2
3
To reconnect AC-input power to a Cisco uBR7246VXR router, complete the following steps:
At the rear of the router, check that the power switch on the power supply is in the off (O) position.
Step 1
Slide the cable-retention clip to the left away from the AC receptacle, and plug in the power cable.
Step 2
Secure the cable in the power supply AC receptacle by sliding the cable-retention clip to the right until
Step 3
it snaps around the connector. The cable-retention clip provides strain relief for the AC power cable.
Plug the AC power supply cable into the AC power source.
Step 4
Note
Repeat Step 1 through Step 4 if a second power supply is installed.
Step 5
This completes the steps for reconnecting AC-input power to a Cisco uBR7246VXR router. Proceed to
the
OL-4448-12
Connecting AC-Input Power to a Cisco uBR7246VXR Router
1
4
Cable-retention clip
Power receptacle
Captive installation screw
For the Cisco uBR7200 series routers, each AC-input power supply operating at 120 VAC
requires a minimum of 7A service.
We recommend powering the Cisco uBR7200 series routers from a 120 VAC, 15A receptacle
U.S. (240 VAC, 10A international) at the power source.
"Powering Up the Router" section on page
Network Processing Engine and Network Services Engine Installation and Configuration
6
5
4
AC power cable
5
Power switch
6
Handle
7-45.
Installing the NPE-G1 or NPE-G2
7-37