Reconnecting Input Power and Powering Up the Router
The following procedures explain how to reconnect input power to a Cisco 7200 VXR router, Cisco
UBR7225VXR, or Cisco uBR7246VXR router, power up the router, and verify a successful system boot.
Read the installation instructions before you connect the system to its power source. Statement 10
Warning
Reconnecting AC-Input Power to the Cisco 7200 VXR Router
To reconnect AC-input power to a Cisco 7200 VXR router, complete the following steps:
At the rear of the router, check that the power switch on the power supply is in the off (O) position.
Step 1
Slide the cable-retention clip up away from the AC receptacle, and plug in the power cable.
Step 2
Secure the cable in the power supply AC receptacle by sliding the cable-retention clip down until it snaps
Step 3
around the connector. The cable-retention clip provides strain relief for the AC power cable.
OL-4448-12
Installing the Chassis in a Telco-Type Rack with an Installed Cable-Management
Bracket
1
2
Rack-mount bracket
Network Processing Engine and Network Services Engine Installation and Configuration
Installing the NPE-G1 or NPE-G2
2
Cable-management bracket
7-35
Need help?
Do you have a question about the NPE-G2 - Network Processing Engine G2 and is the answer not in the manual?
Questions and answers