Advertisement

Site Preparation Guide
F123 Series Shared Office
3D Printing System
Part No. 401692-0001_REV_H

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the F370 CR and is the answer not in the manual?

Questions and answers

Summarization of Contents

Introduction
How to Use This Guide
Explains the different formats used in the guide to convey important information to the user.
About the F123 Series Printers
Provides an overview of the Stratasys F123 Series 3D printers and their technology.
Site Requirements
Physical Specifications and Space Requirements
Details the physical dimensions and weight of the printer, including crated and uncrated states.
Dimensions and Weights
Details physical dimensions and weights for the printer in crated and uncrated states.
Minimum Operational Clearances
Specifies required clearances around the printer for operation and maintenance.
Environmental Requirements
Outlines conditions for temperature, humidity, air quality, and altitude for printer operation.
Heat Output
Lists heat dissipation values for different material types while building and idle.
Power Consumption
Details power usage for various material types in different operational states.
AC Power Requirements
Specifies voltage, frequency, and current requirements for the printer's power supply.
Workstation Requirements
Provides links and information on software requirements for workstation setup.
LAN Requirements
Details network connection requirements for communication and file transfer.
Preparing for Installation
Inspect Crate for Damage
Instructions for checking the shipping crate for any signs of exterior damage.
Required Tools and Equipment
Lists essential tools and equipment needed for unpacking and installation.
Unpacking the Printer
Provides initial steps and considerations for safely removing the printer from its packaging.
Remove Shipping Materials
Step-by-step guide for removing all shipping restraints and packaging materials.
Site Preparation Checklist
Electrical Installation Requirements
Checklist items for ensuring proper electrical setup prior to printer installation.
Environmental Requirements
Checklist items for verifying environmental conditions meet printer specifications.
Required Installation Tasks
Checklist of essential tasks to be completed before and during printer installation.

Table of Contents