Mastervolt MASS COMBI PRO Installation Manual

Mastervolt MASS COMBI PRO Installation Manual

Multiple units

Advertisement

Quick Links

MULTIPLE UNITS
MASS COMBI ULTRA & MASS COMBI PRO
Parallel or three-phase configurations
INSTALLATION MANUAL
10000007117/03

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MASS COMBI PRO and is the answer not in the manual?

Questions and answers

Summarization of Contents

General Information
Use of this manual
Instructions on how to use this installation manual alongside the user manual.
Validity of this manual
Details the purpose and scope of the installation manual for multiple unit configurations.
Purpose of a multiple configuration
Explains reasons for using multiple units, like increased power or redundancy.
Overview of the Mass Combi
Identifies and labels the various components and connectors on the Mass Combi unit.
Flowchart
Installation Procedure Guidance
Flowchart to determine the correct installation procedure based on configuration type.
Parallel Configuration with MasterAdjust
Materials and Preparations
Covers materials and preparation steps for parallel configuration using MasterAdjust.
DC and AC Wiring
Details DC and AC cabling requirements for parallel unit configurations.
Network Wiring
Explains how to connect the units via MasterBus for communication.
Configuration with MasterAdjust
Covers pre-commissioning and initial configuration steps using MasterAdjust software.
Initial Start-up
Guides through the final steps to power on and verify the parallel configuration.
Parallel Configuration with DIP Switches
Materials, Preparations, and DC Wiring
Covers materials, preparations, and DC wiring for DIP switch parallel configurations.
AC and Network Wiring
Details AC and network wiring for DIP switch parallel configurations.
DIP Switch Configuration and Start-up
Guides through DIP switch settings and initial start-up for parallel units.
Three-Phase Configuration with MasterAdjust
Materials and Preparations
Lists required materials and outlines preparatory steps for three-phase setup.
DC and AC Wiring for Three-Phase Units
Details DC and AC wiring for three-phase configurations.
Network Wiring
Covers MasterBus network connections for three-phase units.
MasterAdjust Configuration
Details the configuration steps using MasterAdjust for three-phase setups.
Start-up and Grid Remarks
Outlines startup procedures and general remarks on three-phase public power grids.
Troubleshooting
Troubleshooting with LED Indicators
Explains how LED indicators on the unit display error codes and operational status.
LED Indicators and MasterBus Alarms
Details specific LED patterns, MasterBus alarms, and corresponding troubleshooting actions.
Monitoring a Three-Phase Cluster
Describes how to monitor cluster data in MasterAdjust for three-phase setups.

Table of Contents