Festo CPV-DI02 Elektronics Manual

Festo CPV-DI02 Elektronics Manual

With field bus direct connection
Hide thumbs Also See for CPV-DI02:
Table of Contents

Advertisement

Compact performance
Elektronics manual
CPV valve terminal
with field bus direct
connection
Types:
CPV...−DI02
PROFIBUS−DP
CPV...−CS02
ABB CS31
Manual
548 732
en 0704NH
[706 006]

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CPV-DI02 and is the answer not in the manual?

Questions and answers

Summarization of Contents

Marking Special Information
Pictograms
Explains pictograms used for marking special information in the text.
Text Markings
Explains text markings like bullets, numbers, and hyphens for activities.
1. Installation CPV-DI02 and CPV-CS02
1.1 General Instructions on Installation
Provides essential warnings and precautions before carrying out installation and maintenance work.
1.2 Electrical Connecting and Display Elements
Identifies and describes the various connecting and display elements on the CPV Direct.
1.3 Connecting the Field Bus
Details the process of connecting the field bus, including cable specifications and notes.
1.4 Bus Termination with Termination Resistors (CPV-DI02)
Explains the requirement and method for bus termination using resistors for CPV-DI02.
1.5 Connecting the Power Supply
Covers procedures and considerations for connecting the power supply to the CPV Direct.
1.6 Extending the CPV Direct
Describes how to connect additional CPI/CP modules to the CPV Direct via the extension connection.
1.7 Preparing the CPI System for Commissioning
Outlines steps for preparing the CPI system, including checking CP strings and saving assignments.
1.8 Switching-on Reaction of the CPI System
Details the system's reaction when power is switched on, including status ascertainment.
1.9 Reaction of the CPI System to Faults in Operation
Explains how the CPI system reacts to faults during operation and how to address them.
2. Commissioning CPV-DI02 (PROFIBUS-DP)
2.1 Preparing the CPV Direct for Commissioning
Covers initial steps for preparing the CPV Direct for commissioning, including power supply.
2.2 Device Master File (GSD) and Icon Files
Details the requirement and sources for GSD and icon files for CPV Direct configuration.
2.3 Configuration with a Siemens Master
Guides through configuration steps using STEP 7 software with a Siemens master.
2.4 Examples of Configuration
Provides examples of standard and tool change configurations with addressing details.
3. Diagnosis CPV-DI02 (PROFIBUS-DP)
3.1 Diagnosis via LEDs
Explains how to interpret the operating status of the CPV Direct through its LEDs.
3.2 Diagnosis via PROFIBUS-DP
Details diagnostic possibilities supported via PROFIBUS-DP, including diagnostic words.
3.3 Fault Treatment
Describes fault reactions and treatment based on configured master module responses.
4. Commissioning CPV-CS02 (ABB CS31)
4.1 Preparing the CPV Direct for Commissioning
Covers initial steps for preparing the CPV Direct for commissioning with ABB CS31.
4.2 Configuration
Explains configuration aspects for the CPV Direct when used with an ABB CS31 CPU.
5. Diagnosis CPV-CS02 (ABB CS31)
5.1 Diagnosis via LEDs
Explains how to interpret the operating status of the CPV Direct via LEDs for ABB CS31.
5.2 Diagnosis via the Field Bus
Details diagnostic possibilities via the ABB CS31 system bus for the CPV Direct.
5.3 Setting the Diagnostic Mode
Describes how to set the diagnostic mode, affecting LED and fault flag reactions.
5.4 Fault Treatment
Outlines fault treatment actions and reactions of the CPV Direct to faults.
A. Technical Appendix
A.1 Technical Specifications
Provides common and specific technical specifications for CPV-DI02 and CPV-CS02.
A.2 PROFIBUS-DP: Commissioning with the General DP Master
Details commissioning procedures for PROFIBUS-DP with a general DP master.
A.3 Accessories
Lists necessary and useful accessories, including CP valve supply and bus connections.

Table of Contents