Installation Preparation; Preparing Hood Location - Haier HHN1230DBBB User Manual

Hhv2230 manual
Table of Contents

Advertisement

Installation Preparation

To install this range hood, you will need the following tools and materials:
Note: This procedure will require 2 people for easier installation.
Tools Needed for Installation
Drill
1/8" Drill bit for drilling pilot holes
1-1/4" Wood bit for drilling electrical wiring access hole
Phillips head screwdriver
Flat-head screwdriver
Pliers
Pencil, ruler and level for marking range hood location
Hand saw or jig saw for cutting the wall or cabinet openings
Hi-Temp duct tape
Electrical tape
Connector Clamp
Electrical Conduit

Preparing Hood Location

1. If you have a 2000 series model, you must determine whether hood will
discharge vertically (3¼" x 10" or 7" Round), horizontally (3¼" x 10" only) or
non-ducted. For vertical or horizontal discharge, run ductwork between the hood
location and a roof cap or wall cap. For best results, use a minimum number of
transitions and elbows. 1000 series models can only be installed as non-ducted.
2. Use diagram, below, for proper placement of ductwork and electrical cutout in
cabinet or wall. For a non-ducted installation, DO NOT cut a duct access hole.
English
4

Advertisement

Table of Contents
loading

Table of Contents