Installation Preparation - Haier 3000 Series User Manual

Range hood
Hide thumbs Also See for 3000 Series:
Table of Contents

Advertisement

Installation Preparation

To install this range hood, you will need the following tools and materials:
Note: This procedure will require 2 people for easier installation.
Tools Needed for Installation
• Drill
• 1/8" Drill bit for drilling pilot holes
• 1-1/4" Wood bit for drilling electrical wiring access hole
• Phillips head screwdriver
• Flat-head screwdriver
• Pliers
• Pencil, ruler and level for marking range hood location
• Hand saw or jig saw for cutting the wall or cabinet openings
• Hi-Temp duct tape
• Electrical tape
• Connector Clamp
General Preparation
Caution! Please be sure to turn the electrical power switch OFF before
beginning the installation.
1. Remove the range hood from the carton.
2. Lay the range hood upside down on a table covered with either cardboard or
paper to prevent scratching the hood or table.
3. If you have a 4000 series model, install two (2) 8-watt, 8W-PAR20 LED lights. If
you have 3000 series model, install two (2) 50-watt, halogen lights.
4. Remove the 2 aluminum filters from the hood. Place them somewhere safe so
they will not be damaged
5. Remove the range hood's bottom cover by removing the 2 screws holding it in place.
Put the cover somewhere safe so that it will not be damaged and save the screws
6. Turn the hood right side up so you can see the duct knockouts and mounting holes.
LED Lights
English
fig. 1
4

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

4000 seriesLhv4330

Table of Contents