Installation Preparation - Haier HHX3030 - 05-05 User Manual

Table of Contents

Advertisement

Installation Preparation

To install this range hood, you will need the following tools and materials:
Note: This procedure will require 2 people for easier installation.
Tools Needed for Installation
• Drill
• 1/8" Drill bit for drilling pilot holes
• 1-1/4" Wood bit for drilling electrical wiring access hole
• Phillips head screwdriver
• Flat-head screwdriver
• Pliers
• Pencil, rule and level for marking range hood location
• Hand saw or jig saw for cutting the wall or cabinet openings
• Duct tape
• Electrical tape
• Connector Clamp
General Preparation
Caution! Please be sure to turn the electrical power switch OFF before beginning
the installation.
1. Remove the range hood from the carton.
2. Lay the range hood upside down on a table covered with either cardboard or
paper to prevent scratching the hood or table.
3. Unscrew the 2 lamp covers with a Phillips head screwdriver.
4. Remove the lamp covers.
5. Install two 40 Watt light bulbs.
6. Replace the lamp covers and the screws.
7. Remove the 2 grease filters from the hood. Place them somewhere safe so they
will not be damaged.
8. Remove the range hood's bottom cover by removing the 4 screws holding it in
place. Put the cover somewhere safe so that it will not be damaged and save the
screws.
English
4

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hhx3030

Table of Contents