Table of Contents

Advertisement

746 E R Z16
746 E R Z20
Translation of the original instructions

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 746 E R Z16 and is the answer not in the manual?

Questions and answers

Summarization of Contents

1. Introduction to this Instruction Manual
1.1 Meaning of the Symbols Used
Explains the meaning of various warning, hazard, and information symbols used in the manual.
2. Safety Recommendations
2.1 Installer Safety
Provides safety guidelines for installers, covering personal condition, work area, and PPE.
2.2 Transport and Storage
Details safe handling, transport, and storage instructions for the product, including packaging.
3. 746 E R
3.1 Intended Use
Defines the proper application of the 746 E R gearmotor for sliding gates.
3.2 Limitations of Use
Outlines the operational limits, environmental conditions, and constraints for the gearmotor.
3.3 Unauthorised Use
Lists prohibited uses and modifications to ensure safety and product integrity.
3.4 Emergency Use
Provides instructions for emergency situations and fault handling.
3.5 Product Identification
Details how to identify the product using its rating plate and product warnings.
3.6 Technical Specifications
Lists the key technical data and specifications for the 746 E R gearmotor.
3.7 Component Identification
Identifies and illustrates the components supplied with and separately required for the gearmotor.
3.8 Dimensions
Provides the physical dimensions of the gearmotor and mounting details.
3.9 Manual Operation
Explains how to manually release and operate the gearmotor using the provided key.
4. Installation Requirements
4.1 Mechanical Requirements
Specifies structural, ground, and gate requirements for safe and proper installation.
4.2 Electrical System
Details electrical safety, compliance, and installation requirements for the automation.
4.3 Example System
Illustrates a typical system setup with mains power, gearmotor, and accessories.
4.4 Installation Dimensions
Provides detailed mounting dimensions for the foundation plate and rack installation.
5. Mechanical Installation
5.1 Installing the Foundation Plate
Step-by-step guide for assembling and installing the foundation plate.
5.2 Installing the Gearmotor
Instructions for positioning, mounting, and securing the gearmotor onto the foundation.
5.3 Installing the Rack
Details the process for installing steel or nylon racks onto the gate leaf.
5.4 Adjusting and Checking
Covers final adjustments and checks for the rack-pinion interaction and gearmotor level.
5.5 Fastening the Gearmotor Permanently
Describes the procedure for permanently securing the gearmotor and installing guards.
5.6 Installing the Cover
Instructions for installing the protective cover, including applying hazard signs.
6. Optional Equipment
6.1 Release Lock with Personalised Key
Explains how to install and use the optional personalised key release lock.
7. Electronic Installation
7.1 Removing the Cover from the Board
Procedure for safely accessing the electronic board by removing its cover.
7.2 Board 780D
Overview of the 780D electronic board, its components, and status LEDs.
7.3 Connections
Details the wiring connections for the motor, flashing light, encoder, and limit switches.
7.4 Installing the Cable Glands
Instructions for correctly installing cable glands to protect wiring.
7.5 Installing the Board Cover
Procedure for reinstalling the electronic board's protective cover.
8. Start-Up
Set-up Procedure
Step-by-step guide for initial setup, limit switch installation, and programming.
8.1 Installing the Limit Switches
Detailed instructions for positioning and installing the opening and closing limit switches.
8.2 Programming the Board
Guide to basic and advanced programming functions for the automation logic.
8.3 Operating Logics
Explanation of different operating logic modes (Automatic, Semi-automatic, Dead-man).
8.4 Adjusting the Anti-Crushing System
Details on adjusting static force, obstacle detection, and anti-crushing system.
9. Putting into Service
9.1 Final Operations
Final checks, safety signage, CE marking, and documentation for putting the system into service.
10. Accessories
10.1 Flashing Light
Instructions for installing and connecting a flashing light indicator.
10.2 Photocellls
Guide to installing and connecting photocells, including FailSafe test.
10.3 Sensitive Edges
Information on installing and connecting sensitive edges with FailSafe test.
10.4 LED/Timed Lamp, Traffic Light Control, Electric Lock
Programming functions for outputs like LED, timed lamp, traffic lights, and electric locks.
11. Diagnostics
11.1 Connection Status
How to check connection status using LEDs on the board.
11.2 Status of the Automation
Interpreting the 2-digit display codes indicating the automation's operational status.
11.3 Request Assistance Alert
Configuration of the assistance alert for scheduled maintenance.
12. Maintenance
12.1 Routine Maintenance
Lists routine maintenance tasks for structures, gate, gearmotor, and electronic equipment.
12 Scheduled Maintenance
Details scheduled maintenance operations and their frequency for various system components.
13. Instructions for Use
13.1 Safety Recommendations
Essential safety guidelines for users operating the automated gate system.
13.2 Emergency Use
Instructions for handling emergencies, faults, and environmental conditions.
13.3 Manual Operation
Procedure for manually releasing and operating the gate's gearmotor.

Table of Contents