Motorline OL1500 Operating And Installation Instructions

Motorline OL1500 Operating And Installation Instructions

Slide series automation systems for sliding gates

Advertisement

English
AUTOMATION SYSTEMS FOR SLIDING GATES
Operating and installation instructions
SLIDE SERIES
v1.0
Rev 11/2012

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the OL1500 and is the answer not in the manual?

Questions and answers

Summarization of Contents

Description
Structure Description
Details the components and their arrangement within the gate automation system.
Dimensions
Provides the physical dimensions of the automated gate system components.
Installation
Preliminary Checks
Ensures the gate structure and environment are suitable before installation.
Foundation Plate Preparation
Details fitting nuts into the foundation plate for mounting.
Foundation Plate Positioning
Describes correct placement of the foundation plate for rack and pinion alignment.
Operator Positioning
Describes how to place and secure the operator unit on the foundation plate.
Operator Adjustment
Explains how to set the correct distance between the operator and the gate.
Operator Fixing
Details the process of tightening screws to firmly secure the operator.
Manual Release Procedure
Instructions on how to switch the operator to manual mode using the key.
Rack Installation
Guides the installation of the toothed rack onto the gate leaf.
Limit Switch Plate Installation
Explains how to mount limit switch plates on the rack for gate travel control.

Table of Contents

Save PDF