Alamo Industrial Lawn Mower Operator's Manual page 98

Boom arm mower
Table of Contents

Advertisement

BOOM ARM ASSEMBLY
Inspect condition of each arm section weldment
Ensure all pins are in place.
Ensure all bolts and screws are properly
installed.
Check condition of teflon bushings at boom
pivot points.
Ensure each hydraulic cylinder is installed and
retained correctly. Ensure the proper size pins
are used to retain the cylinders in place and are
secured properly. OPS-B- 0022_D
Never attempt to lubricate, adjust, or remove material from the Implement while it is in
motion or while tractor engine is running.
HYDRAULIC LINE INSPECTION
Check for hydraulic leaks along hoses, cylin-
ders and fittings. IMPORTANT: DO NOT use
your hands to check for oil leaks. Use a piece
of heavy paper or cardboard to check for
hydraulic oil leaks.
Inspect the condition of the valve weldment.
Ensure fitting is properly connected
Inspect condition of nylon bushings.
OPS-B- 0023_D
Do not operate this Equipment with hydraulic oil or fuel leaking. Oil
and fuel are explosive and their presence could present a hazard. Do
not check for leaks with your hand! High-pressure oil streams from
breaks in the line could penetrate the skin and cause tissue damage
including gangrene. To check for a hose leak, SHUT the unit ENGINE
OFF and remove all hydraulic pressure. Wear oil impenetrable gloves,
safety glasses and use Cardboard to check for evidence of oil leaks. If
you suspect a leak, REMOVE the HOSE and have it tested at a Dealer.
If oil does penetrate the skin, have the injury treated immediately by a
physician knowledgeable and skilled in this procedure.
AXTREME 2 02/10
© 2010 Alamo Group
OPERATION
(SG-20)
Hydraulic Hoses
Operation Section 3-12
(SG-15)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Axtreme 2

Table of Contents