Diagram 4-26
NOTE: This screen may be different for different types of UPSs.
Step 2 Select UPS from com. port list. Users still can retrieve old data saved in the
software even though the UPS is no longer connected to local system.
Step 3 Select cycle and period time. Then click "Browse" button to get the diagram.
Step 4 Select monitoring parameters on left-hand tab to switch diagram.
4.5. Format
Full Screen: Click "Full Screen" to get the software in full screen. Then press "ESC" key
to get back to normal screen.
Users can choose formats for temperature unit and date.
Temperature Unit: There are two temperature units for selecting: Centigrade and
Fahrenheit. Default setting is centigrade.
Date Format: There are four formats for date display: YYYY-MM-DD, YYYY/MM/DD,
MM-DD-YYYY, MM/DD/YYYY. Default setting is YYYY-MM-DD.
42