Installation Tools - 3Com LSBM1SRP1M1 Installation Manual

S9500 series routing switches
Table of Contents

Advertisement

Installation Manual
H3C S9500 Series Routing Switches

2.5 Installation Tools

Table 2-10 Required installation tools
General
tools
Special tools
Note:
The instruments and tools are not shipped with the S9500 series. Therefore, you need
to prepare the required instruments and tools.
Measure
and
Long tape, ruler (1 meter in length), gradienter, marking
lineation
pen, powder marker, pencil
tools
One percussion drill, several drill bits, one vacuum
Drills
cleaner
Plain screwdriver P4 - 75 mm
Cross-head screwdriver P1 – 100 mm, P2 – 150 mm
and P3 – 250 mm
Fastening
Box wrench M5
tools
Ring spanner M6
Double ring spanner (10-12) or open ended spanner
(10-12)
Sharp-nose pliers, diagonal pliers, vices, hand-held
Small tools
electric drill, file, handsaw, crowbar, rubber hammer
Auxiliary
Brush, tweezers, paper knife, hand bellows, electric
tools
iron, solder wire, fork, ladder
ESD-preventive wrist strap, cable stripper, crimping
pliers, RJ-45 crimping pliers, wire punch-down tool
Multimeter, 500 V Meg-ohmmeter (used for measuring
Meters
the insulation resistance), error detector, optical power
meter, earth resistance tester
Chapter 2 Installation Preparations
2-17

Advertisement

Table of Contents
loading

Table of Contents