Requirements Of Power Distribution Box; Installing The Ac Power Distribution Box - 3Com LSBM1SRP1M1 Installation Manual

S9500 series routing switches
Table of Contents

Advertisement

Installation Manual
H3C S9500 Series Routing Switches
Figure 2-3 shows an angle support.
(1) Angle support
Figure 2-3 Angle support

2.4 Requirements of Power Distribution Box

You can install a power distribution box in the cabinet as required.

2.4.1 Installing the AC Power Distribution Box

I. Terminal Block
The terminal block is set on the bottom of a power distribution box.
Figure 2-4 Terminal block structure diagram
The terminal block has 21 terminals to connect power cords: seven gray terminals,
seven blue terminals and seven yellow-green terminals.
The gray terminals from L1 to L7 are output ports for live wire. These ports are
connected to each other.
The blue terminals from N1 to N7 are output ports for neutral wire. These ports are
connected to each other.
The yellow-green terminals from PE1 to PE7 are output ports for earth wire. These
ports are connected to each other and connected to the cabinet.
Chapter 2 Installation Preparations
2-9

Advertisement

Table of Contents
loading

Table of Contents