Installation Manual
H3C S9500 Series Routing Switches
(1) User-supplied power distribution box
(3) Power distribution box of the cabinet
(5) PoE power entry module
(7) System power input
(8) Interface area on external PoE power supply panel
(9) External PoE power supply
(11)~(17) No.1 to No.7 power cable
(19) Terminal block
Figure 2-7 Cable connections on the power distribution box
Note:
If NEPS600-A is applied, you must use the four spare 10A cables.
Chapter 2 Installation Preparations
(2) Guide rail
(4) S9505 chassis
(6) S9505 chassis
(10) PoE AC socket
(18) N68 cabinet
2-12