KwikGoal 9B6308 Assembly Instructions Manual

Club shelter

Advertisement

Quick Links

*THIS UNIT MUST BE ASSEMBLED BY A MINIMUM OF TWO QUALIFIED PERSONS*
1. Unpack all parts and check for damage that may have occurred during shipping. If damage has occurred,
notify Kwik Goal immediately. Lay out all parts. Remove all cardboard and packaging immediately. Wet or
damp packaging may damage contents.
2. Read through entire instruction before beginning assembly and installation.
NOTE: Components may be packaged in one or more additional boxes.
Parts
Crossbar (1)
(Part#UZ1660)
(Part#UZ1659)
(Part# UZ1628)
THIS UNIT MUST BE ANCHORED ACCORDING TO THESE INSTRUCTIONS AT ALL TIMES
THIS EQUIPMENT MUST BE STORED IN A SECURED, SHELTERED AREA WHEN NOT IN USE OR IN THE THREAT
OF HIGH WINDS. ANY WEATHER DAMAGE TO THIS EQUIPMENT WILL NOT BE COVERED UNDER KWIK GOAL'S
PRODUCT GUARANTEE. DO NOT LEAVE THIS EQUIPMENT UNATTENDED.
ASSEMBLY INSTRUCTIONS FOR 9B6308 CLUB SHELTER
279-3/4"
279-3/4"
Base (2)
58"
140 Pacific Drive Quakertown, PA 18951
800-531-4252 Kwikgoal.com
©
2019, Rev. 2021 Kwik Goal Ltd.
(Part# UZ1617)
58"
Right Base Corner (1)
(Part#UZ1622)
(Part#UZ1327)
(Part# UZ1627)
58"
Warning Sticker
(Part#UZ1623)
(Part#UZ1621)
NZ442 Rev. 05/20/21

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 9B6308 and is the answer not in the manual?

Questions and answers

Summary of Contents for KwikGoal 9B6308

  • Page 1: Table Of Contents

    ASSEMBLY INSTRUCTIONS FOR 9B6308 CLUB SHELTER *THIS UNIT MUST BE ASSEMBLED BY A MINIMUM OF TWO QUALIFIED PERSONS* 1. Unpack all parts and check for damage that may have occurred during shipping. If damage has occurred, notify Kwik Goal immediately. Lay out all parts. Remove all cardboard and packaging immediately. Wet or damp packaging may damage contents.
  • Page 2 OR PULL 90 Person at Post PUSH OR PULL NO PUSH   WITHIN 120   OR PULL 90 NEVER LEAVE SHELTERS UNATTENDED AND UNSECURED 140 Pacific Drive Quakertown, PA 18951 800-531-4252 Kwikgoal.com © 2018, Rev. 2019 Kwik Goal Ltd. NZ442 Rev. 05/20/21...
  • Page 3 Parts Continued End Frame Bow (2) Center Frame Bow (5) Left Side Cover (1) Right Side Cover (1) (Part# UZ1620) (Part# UZ1619) (Part# VZ835) (Part# VZ836) 3 Holes 1 Hole each end each end Ground Anchor (4) Bow Brace (4) Swivel Wheel Center Cover (1) Swivel Wheel (2)
  • Page 4: Bottom Crossbar

    Parts Continued Note: Hardware is packed separately in one or more boxes. Open all boxes and layout all sealed hardware packs before beginning assembly. Frame Hdw Bow Hdw (Part#JZ258) (Part# JZ239) 5/16” X 1” Hex Bolts (20) 5/16” X 2” Hex Bolt (10) (Part# TZ330) (Part# TZ184)
  • Page 5 4. Attach swivel wheels w/ brakes to right & left base corners as shown. Right Base Corner Right Base Corner 5/16” Square Nut 5/16” Square Nut 5/16” Flat Washer 5/16” Flat Washer 5/16” Lock Washer 5/16” Lock Washer 5/16” X 1” Hex Bolt 5/16”...
  • Page 6: Left Post

    6. Assemble crossbar, posts, crossbar corners, and post corners. NOTE: Square nuts will float loose in channels until used later. Do NOT tighten bolts at this time. 3/8” x 1” Socket Head Cap Screw 3/8” x 1” Socket Head Cap Screw 3/8”...
  • Page 7: Left Base Corner

    7. Assemble crossbar, bases, left and right base corners. NOTE: Square nuts will float loose in channels until used later. Do NOT tighten bolts at this time. 3/8” x 1” Socket Head Cap Screw 3/8” Lock Washer Right Base Corner Crossbar 3/8”...
  • Page 8: Post Corner

    8. Attach assembled base to post corners as shown. Note: Tighten all bolts at this time. 3/8” Lock Washer Assembled Base 3/8” Square Nut 3/8” x 1” Socket Head Cap Screw Post Corner Post Corner Assembled Base Post Corner THIS UNIT MUST BE ANCHORED ACCORDING TO THESE INSTRUCTIONS AT ALL TIMES THIS EQUIPMENT MUST BE STORED IN A SECURED, SHELTERED AREA WHEN NOT IN USE OR IN THE THREAT OF HIGH WINDS.
  • Page 9 9. Hardware for steps 9 through is in14 Bow Hdw pack. Attach right & left top bow connectors to assembled frame using 3/8” square nuts at crossbar corners as shown. 3/8” X 7/8” Hex Bolt 3/8” Lock Washer 3/8” Flat Washer Left Top Bow Connector Left Post Crossbar...
  • Page 10 10. Starting at left top bow connector push nine 3/8” square nuts towards the right top bow connector. Skip one 3/8” square nut and attach center bow connectors to crossbar at locations shown. Center Bow Connector 3/8” X 7/8” Hex Bolt 3/8”...
  • Page 11: End Frame Bow

    11. Assemble left and right end frame bows as shown. Note: May need to draw 5/16” X 2” carriage bolt head into hole by just using 5/16” flat washer and 5/16” hex nut first then remove 5/16” hex nut add lock washer. Do NOT tighten bolts at this time. 5/16”...
  • Page 12 12. Attach left and right frame bows to bow connectors at crossbar corners. Do NOT tighten bolts at this time. Left Frame Bow 3/8” X 7/8” Hex Bolt 3/8” Lock Washer 3/8” Flat Washer Crossbar 5/16” X 2” Carriage Bolt Right Frame Bow 3/8”...
  • Page 13 14. Attach one center bow connector to all three center frame bows. Center Bow Connector Center Bow Connector Center Frame Bow 5/16” Lock Nut 5/16” Flat Washer 5/16” X 2” Hex Bolt Center Frame Bow 15. Attach center frame bows to crossbar at center bow connector locations. Center Frame Bow 5/16”...
  • Page 14 16. Attach center frame bows to crossbarusing 3/8” square nuts at locations shown. Crossbar 3/8” Square Nut 3/8” Lock Washer 3/8” Flat Washer 3/8” X 7/8” Hex Bolt Center Frame Bow Center Bow Connectors 43-7/16” 43-7/16” Crossbar 43-7/16” Bottom Crossbar THIS UNIT MUST BE ANCHORED ACCORDING TO THESE INSTRUCTIONS AT ALL TIMES THIS EQUIPMENT MUST BE STORED IN A SECURED, SHELTERED AREA WHEN NOT IN USE OR IN THE THREAT OF HIGH WINDS.
  • Page 15: Center Cover

    17. Lay out center cover along crossbar with angled corners toward crossbar and hem edge up. Making sure center cover is evenly spaced between left and right post, attach center cover to left crossbar corner with cover clip as shown. Right Post Center Cover Cover Clip...
  • Page 16: Swivel Wheel

    19. Attach center cover to crossbar at all grommet locations with cover clips. 20. Pull center cover over frame bows, starting at one base corner, attach center cover to base at all grommeted locations with base bungees. Attach center cover to frame bows on left and right sides as shown. Note: One person hold corner of center cover while the other attach bungees base corner and bow.
  • Page 17 22. On left side cover, find angled corner and with the hem edge inside, attach angled corner to frame bow with bow bungee. With bow bungee holding corner, attach left side cover to the left post with cover clips. Bow Bungee Left Side Cover Cover Clip Left Post...
  • Page 18 25. Hardware for step 25 is in Anchor Hdw pack. Attach anchor plates and chains to bases as shown below. 3/8” x 7/8” Hex Bolt 3/8” Lock Washer 3/8” Flat Washer Chain & anchor plate 3/8” Square Nut 3/8” x 7/8” Hex Bolt 3/8”...
  • Page 19: Ground Anchor

    26. Permanent ground anchors must be used at all times. Dig four holes according to the layout below. Note: Areas subject to heavy frost may require depths as deep as 36”. Prepare holes and add drain stone as shown. Install anchor in each hole and fill hole with concrete.
  • Page 20 Kwik Fill Anchor Bag Base Crossbar Go to kwikgoal.com for additional product information. THIS UNIT MUST BE ANCHORED ACCORDING TO THESE INSTRUCTIONS AT ALL TIMES THIS EQUIPMENT MUST BE STORED IN A SECURED, SHELTERED AREA WHEN NOT IN USE OR IN THE THREAT OF HIGH WINDS.

Table of Contents