Download Print this page

KwikGoal 2P201 Assembly Instructions Manual

Official futsal goal

Advertisement

Quick Links

ASSEMBLY INSTRUCTIONS FOR 2P201 OFFICIAL FUTSAL GOAL
1. Unpack all parts and check for damage that may have occurred during shipping. If damage has occurred,
notify trucking company immediately. Lay out all parts. Remove all cardboard and packaging immediately.
Wet or damp packaging may damage contents.
2. Read through entire instruction before beginning assembly and installation.
Left Arm Assembly (1)
(Part# UZ829)
140 Pacific Drive Quakertown, PA 18951
(P) 215-536-2200 / (P) 800-531-4252 / (F) 215-536-4309 / (F) 800-778-8869
Visit our website @ kwikgoal.com
Crossbar (1)
(Part# UZ813)
Back Bottom Bar (1)
(Part# UZ831)
2002, Rev. 2017 Kwik Goal Ltd.
Right Arm Assembly (1)
(Part# UZ830)
NZ181 Rev. 07/17/17

Advertisement

loading

Summary of Contents for KwikGoal 2P201

  • Page 1 ASSEMBLY INSTRUCTIONS FOR 2P201 OFFICIAL FUTSAL GOAL 1. Unpack all parts and check for damage that may have occurred during shipping. If damage has occurred, notify trucking company immediately. Lay out all parts. Remove all cardboard and packaging immediately. Wet or damp packaging may damage contents.
  • Page 2 10. Fully disassemble goals for seasonal storage. 140 Pacific Drive Quakertown, PA 18951 (P) 215-536-2200 / (P) 800-531-4252 / (F) 215-536-4309 / (F) 800-778-8869 Visit our website @ kwikgoal.com 1998 rev 2009 Kwik Goal Ltd. NZ181 Rev. 07/17/17...
  • Page 3 Net (1) Net Clip (40) Channel Spacer (2) (Part# 3B5001) (Part# VZ116) (Part# UZ812) Anchor Bag (4) Ground Anchor (4) (Part# 10B1605) w/hardware (Part# UZ212) Hardware Assembly Tools Note: Hardware may be packaged separately Ratchet with 7/16”, 9/16” & 3/4” in one or more boxes.
  • Page 4 3. Lay out right arm assembly and left arm assembly face down on ground, and attach eye bolt to backstays. 4. Insert channel spacers into channel on each end of top rail. Connect rail with 3/8" hex bolts. NOTE: Special stainless steel hardware is used on rail connections. Be sure to use hardware packaged seperately and labeled as JZ71.
  • Page 5 5. Attach back bottom bar to floor shoe using 3/8” flat head bolt in floor shoe and fasten using 3/8" lock washers, 3/8” flat washer, and 3/8" hex nuts. 3/8" Hex Nut 3/8" Lock Washer 3/8" Flat Washer Back Bottom Bar 3/8”...
  • Page 6 6. For indoor use, anchor goal to floor through holes located in floor shoes or place four anchor bags in accordance with picture below. Anchor bags must weigh a minimum of 40 lbs. each. Be sure to fasten anchor bags to goal using attached strap. Note: For outdoor applications, continue with steps 7 through 11. For indoor use, skip to step 10.
  • Page 7 7. Set goal onto bases in desired location and mark anchor hole locations. Move goal and dig holes a minimum of 24” in diameter and 20” deep. (NOTE: Areas subject to heavy ground frost may go as deep as 36”.) 8.
  • Page 8: Side View

    To attach net to goal, place base of net clip into channel and turn 90 degrees to lock into place. NOTE: BE SURE GOAL IS PROPERLY ANCHORED BEFORE ATTEMPTING TO ATTACH OR REMOVE NET. CAUTION: DO NOT ATTEMPT TO CLIMB ON GOAL WHILE ATTACHING NET. Side View Net Clip Net Clip...
  • Page 9 (See Guidelines for Moveable Soccer Goal Safety, included). Insert red ground anchor caps into exposed ground anchor hole to prevent damage to threads. Go to kwikgoal.com for additional product information. ***CAUTION*** This goal has been designed to be used for the game of soccer only. Goal posts must be anchored AT ALL TIMES and shall be secured against overturning.