Warning! Use safety glasses
when building this equipment.
Do not use this appliance until you
have read these instructions!
01/2025
Product No. 234002

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ProLine TS 63 E and is the answer not in the manual?

Questions and answers

Summary of Contents for Podab ProLine TS 63 E

  • Page 1 ProLine Drying Cabinet TS 63 E Installation and operation manual Warning! Use safety glasses when building this equipment. Do not use this appliance until you 01/2025 have read these instructions! Product No. 234002...
  • Page 3: Table Of Contents

    Contents Safety regulations Important safety instructions Specification Dimensions Technical information Assembly instructions Swinging hanging rail installation Single bar installation Shelf installation 20-21 Installation of the cabinet Step 1: Put the cabinet in place Step 2: Fasten the cabinet to the wall Step 3: Connect the cabinet to the ventilation channel Step 4: Connect the drying cabinet to the main switch Step 5: Control that the heating relay is working...
  • Page 4: Dear Customer

    Dear Customer Sparing use of energy and short drying times help to ensure that We are pleased that you have chosen our drying cabinet. you can use your drying cabinet as economically as possible. Your new drying cabinet is the result of many years of develop- Please read these instructions carefully to enable you to use ment work.
  • Page 5: Safety Regulations

    Safety regulations Throughout this manual you will find text warnings in text boxes: “WARNING” and “CAUTION”. In these boxes you’ll find the safety measurements you’ll have to take; end user, service staff or instal- lation staff. CAUTION Indicates hazardous situation that, if not avoided, could cause minor personal injury or property damage.
  • Page 6: Important Safety Instructions

    Important safety instructions WARNING To minimize the risk of fire, electrical shock, personal injuries or death when the cabinet is in use the following precautions must be followed: Read the instruction before using the drying cabinet. Follow the installation instructions for proper grounding. Never dry textiles that have been washed, dipped or exposed to fire dangerous substances or fluids.
  • Page 7: Specification

    Specification Dimensions Measurements shown in millimeter (mm). 1200 1200 1855 A = Electrical connection 1855 B= Exhaust...
  • Page 8: Technical Information

    Technical Information Machine type Drying cabinet Product No. 234002 Warrany 3 years limited Color Grey Mail data Type Air vented Hanging length (swinging hanging rail) ft/m 52.5/16 Capacity (dry weight) lb/kg 22/10 Interior capacity cu ft/L 34.7/983 Drying capacity oz/min Drying capacity g/min Energy consumption...
  • Page 9: Assembly Instructions

    Assembly instructions Tools You need the following tools to easily install the drying cabinet, : • Cordless screwdriver • Wrench • Hex key 3 and 5 mm • Level • Torx screwdriver bit no. 25...
  • Page 11 Note! Only for cabinets with hang- ing frame.
  • Page 12 Note! Only for cabinets with hanging frame...
  • Page 14 Note! Only for cabinets with hanging frame/swinging hanging rail...
  • Page 15 WARNING When positioning the top, make sure no cables get caught between the top and the frame.
  • Page 17: Control Board

    Connect the cables Light (LIGHT) Relay board Humidity sensor (HUMIDITY) Control board Temp sensor (NTC1) Relay board (X11) Door switch (DOOR)
  • Page 18 Note! Only for cabinets with hanging frame/swinging hanging rail Note! Only for cabinets with hanging frame/swinging hanging rail...
  • Page 19 Note! Only for cabinets with single rack bar Note! Only for cabinets with single rack bar Repeat on left side...
  • Page 20: Shelf Installation

    Note! If shelf rails are not already pre-installed Repeat on left side Shelves with holders are sold separately...
  • Page 22: Installation Of The Cabinet

    Installation of the cabinet Step 1: Put the cabinet in place Disconnect the bulb’s connection plinth marked “LIGHT” and the flat cable connected to “X11” from the relay board. Open the service hatch to access the program board (side Place the cabinet with enough space in front of the cabinet and frame of the cabinet).
  • Page 23: Step 2: Fasten The Cabinet To The Wall

    Step 2: Fasten the cabinet to the wall Step 3: Connect the cabinet to the ventilation channel For further instructions, se page 27; Requirements for ventilation. Use the angle irons to secure the cabinet to the wall. The mounting holes are placed at the top of the cabinet. The angle •...
  • Page 24: Step 4: Connect The Drying Cabinet To The Main Switch

    Step 4: Connect the drying cabinet to the main switch To prevent that fi re and electric shock appear, the cabinet MUST be connected according to the color codes on the cables. Only an authorized electrician is allowed to install the electrical con- nection.
  • Page 25: Turn The Hanging Frame

    Turn the hanging frame/swinging hanging rail The hanging frame can be turned. The cabinet is delivered with a Disconnect the cables which are passing through the rubber right-hung stand as standard. If a left-hung position is desired, fol- grommet on the support plate, from the keypad and LCD to low the instructions below.
  • Page 26: Adjust The Rotary Inertia Of The Hanging Frame

    Adjust the rotary inertia of the hanging frame 13. Repeat the same proceedure with the three remaining hang- ing levels. At the top of the hanging frame pole there is a bolt for adjusting 14. Put the hanging frame back in and put the pole on the upper the rotary inertia.
  • Page 27: Requirements For Ventilation

    Requirements for ventilation Ventilation channel – design WARNING IMPORTANT: Always make the channels as short as possible. A drying cabinet produces inflammable dust. To minimize the NOTE: If a drying cabinet is installed in an old ventilation chan- risk for fire, the evacuation of the cabinet must be connected nel, please clean the channel properly.
  • Page 28: Evacuated Amount Of Air And Pressure Fall

    Evacuated amount of air and pressure fall Decrease the outgoing air flow The cabinets function and automatic programmes are optimized In order to get the cabinet to work properly, the ventilation chan- for the recommended air flow of 135 cfm / 230 m³/h. If the design nel shall be designed to get an out coming air flow from the cabi- of the ventilation is made so that evacuated air flow exceeds 135 net of about 135 cfm / 230 m³/h.
  • Page 29: User Manual

    User manual Fill the cabinet Cool down All programs have a cool down phase of 10 minutes. This cool To get the best drying result: dry the same type of material at down time is included in the chosen time for the timed drying the same time.
  • Page 30: Maintenance

    Maintenance Take good care of the cabinet Only use a damp cloth with a mild detergent when cleaning the cabinet. Never use solvent to clean the display. Ventilation system Loosen the ventilation pipe on the cabinet every year and clean if necessary around the evacuating channel.
  • Page 31: Warranty

    Warranty Customer care If you have encountered a problem that you cannot resolve, please contact your dealer. www.podab.com +1 (800) 683-4873 support.na@podab.com When making contact, provide the details on the serial number plate. Include the product number (1) and the serial number (2).