Podab ProLine FC 20 Installation And Operation Manual

Podab ProLine FC 20 Installation And Operation Manual

Drying cabinet

Advertisement

Installation and operation manual
Drying cabinet ProLine FC 20

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ProLine FC 20 and is the answer not in the manual?

Questions and answers

Summary of Contents for Podab ProLine FC 20

  • Page 1 Installation and operation manual Drying cabinet ProLine FC 20...
  • Page 2 © PODAB 2019...
  • Page 3: Table Of Contents

    Requirements for incoming air Ventilation channel – design Evacuated amount of air and pressure fall User manual Automatic programs Select drying time manually Maintenance Take good care of the cabinet Ventilation system Keep your cabinet efficient and economical Notes © PODAB 2019...
  • Page 4 Thank you for choosing the drying cabinet FC 20 from PODAB. We hope that it will be of great use for you and ask you kindly to read the instructions carefully. IMPORTANT! FOR YOUR SAFETY, the information in this manual must be followed to prevent property damage and personal injury.
  • Page 5: Safety Regulations

    17. Never try to manipulate or connect past any safety func- tions. 18. If the cabinet is not assembled after the manufacturer’s instructions, there is a risk that the cabinet can cause per- sonal injuries or injuries on property. © PODAB 2019...
  • Page 6: Specification

    15 % for cotton wool suits. Dried to 4 % residual moisture. Electrical connection 3~N, 380-415V, 50/60Hz 3~, 220-240V, 50/60Hz 3~, 440V, 50/60Hz 3~, 480V, 50/60Hz Fuse, A Heating effect, kW 12,0 12,0 12,0 12,0 Total effect, kW 12,45 12,45 12,45 12,45 © PODAB 2019...
  • Page 7: Assembly Instructions

    Assembly instructions Tools You need the following tools to easily install the drying cabinet, FC 20: • Cordless screwdriver • Wrench • Hex key 3 and 5 mm • Level • Torx screwdriver bit no. 25 © PODAB 2019...
  • Page 8 © PODAB 2019...
  • Page 9 (repeat step 3-5) © PODAB 2019...
  • Page 10 © PODAB 2019...
  • Page 11 © PODAB 2019...
  • Page 12 © PODAB 2019...
  • Page 13 © PODAB 2019...
  • Page 14 © PODAB 2019...
  • Page 15 © PODAB 2019...
  • Page 16 Connect the cables Lights (LIGHT) Relay board Humidity sensor Control board (HUMIDITY) Temp sensor (NTC1) Relay board (X11) Door switch (DOOR) © PODAB 2019...
  • Page 17 © PODAB 2019...
  • Page 18: Installation Of The Cabinet

    • The construction shall be as straight as possible. • Always isolate ducts that go through non-isolated areas. The condensation makes dust and dirt get stuck in the channel. © PODAB 2019...
  • Page 19: Requirements For Ventilation

    Con- Never let the evacuated air into a room or a surrounding where tact PODAB for more information. there is a risk for ignition. Do not use ventilation channels in plastic or fire dangerous Ventilation channel –...
  • Page 20: Evacuated Amount Of Air And Pressure Fall

    300 m3/h. If the design of the ventilation is made so that evacuated air flow exceeds 300 m3/h, the evacuation can be throttled with help of a damper. Contact a ventilation expert in order to find a proper solution for your ventilation. © PODAB 2019...
  • Page 21: User Manual

    0:15h. Increase the drying time with the plus button. The drying CAUTION time can be increased to a maximum of 5:00h. If a program is interrupted before the cool down has finished, the ceiling of the cabinet could be very hot. © PODAB 2019...
  • Page 22: Maintenance

    Keep your cabinet efficient and econom- ical • The ventilation channels shall be as short as possible. • If possible, dry the same type of textiles at the same time. © PODAB 2019...
  • Page 23: Notes

    Notes © PODAB 2019...
  • Page 24 SERVICE/SUPPORT Phone +46 31-752 01 70 E-mail support@podab.se www.podab.com AB PODAB, Ekonomivägen 9, 436 33 Askim, SWEDEN Tel +46 (0)31-752 01 00, E-mail: export@podab.se, www.podab.com ©PODAB 2019-12-02...

Table of Contents