Download Print this page

Peri UP Flex Instructions For Assembly And Use

Reinforcement scaffold 75 and 100

Advertisement

Quick Links

PERI UP Flex
Reinforcement Scaffold 75 and 100
Instructions for Assembly and Use – Standard Configuration – Issue 03/2021
incl. supplemental pages PERI UP Flex 2nd generation

Advertisement

loading
Need help?

Need help?

Do you have a question about the UP Flex and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Peri UP Flex

  • Page 1 PERI UP Flex Reinforcement Scaffold 75 and 100 Instructions for Assembly and Use – Standard Configuration – Issue 03/2021 incl. supplemental pages PERI UP Flex 2nd generation...
  • Page 2 Overview Base width 150, Ledger Heavy Duty UHV 150 Plus Addition Plus Basic Plus Addition Basic PERI UP Flex Reinforcement Scaffold 75 and 100 Instructions for Assembly and Use – Standard Configuration...
  • Page 3: Table Of Contents

    Access decks, decking and guardrails B2 Assembly of Extensions Standards and Ledgers Access decks, decking and guardrails Stability Additional levels B3 Pressure-resistant ties B4 Dismantling Recommendation PERI UP Flex Reinforcement Scaffold 75 and 100 Instructions for Assembly and Use – Standard Configuration...
  • Page 4: Overview

    Overview Base width 250 cm, Ledger Heavy Duty UHV 250 Plus Addition Plus Basic Plus Addition Basic PERI UP Flex Reinforcement Scaffold 75 and 100 Instructions for Assembly and Use – Standard Configuration...
  • Page 5: Main Components

    Alternatively, Industrial Decks UDI can be used instead of Steel Decks UDG. Note Item numbers beginning with the numbers 3 and 4 are only available as rental or used items. PERI UP Flex Reinforcement Scaffold 75 and 100 Instructions for Assembly and Use – Standard Configuration...
  • Page 6: Key

    Set-up of the safety instructions ble. Signal word Type and source of the danger! Consequences of non-compliance. ⇒ Avoidance measures ⇒ PERI UP Flex Reinforcement Scaffold 75 and 100 Instructions for Assembly and Use – Standard Configuration...
  • Page 7: Introduction

    (RAB 30) Additional technical documentation Approvals: ƒ – Approval Z-8.22-863 PERI UP Flex Modular System – Approval Z-8.1-957 PERI UP Easy Scaffold System Instructions for Assembly and Use: ƒ – PERI UP Flex Core Components –...
  • Page 8: Intended Use

    Features System dimensions Product description PERI products have been designed for The system is based on PERI UP Flex System width: 75 cm and 100 cm exclusive use in the industrial and com- Modular Scaffold with supplementary Storey height: 200 cm mercial sectors by qualified personnel components.
  • Page 9: Cleaning And Maintenance Instructions

    Do not clean components suspended on crane lifting gear. Any repairs to PERI products are to be carried out by PERI qualified personnel only. PERI UP Flex Reinforcement Scaffold 75 and 100 Instructions for Assembly and Use – Standard Configuration...
  • Page 10: Safety Instructions

    EN 74. the scaffolding contractor must create then coordinated. installation instructions in order to en- sure safe assembly, modification and dismantling of the scaffolding system. PERI UP Flex Reinforcement Scaffold 75 and 100 Instructions for Assembly and Use – Standard Configuration...
  • Page 11: System-Specific

    For transportation, the surface used must have sufficient load-bearing ca- pacity. Use original PERI storage and transport systems, e.g. crate pallets, pallets or stacking devices. PERI UP Flex Reinforcement Scaffold 75 and 100 Instructions for Assembly and Use – Standard Configuration...
  • Page 12: Identification Markings

    – TRBS 1203 – Regulations for Occupational Health and Safety on Construction Sites 30 (RAB 30) The latest version in each case is applicable. PERI UP Flex Reinforcement Scaffold 75 and 100 Instructions for Assembly and Use – Standard Configuration...
  • Page 13: Inspection, Hand-Over And Utilisation

    Spacing between the building and edge of tolerances decking Decking dependent on the falling height Protection panel in roof safety scaffold Source: based on TRBS 2121 Part 1 PERI UP Flex Reinforcement Scaffold 75 and 100 Instructions for Assembly and Use – Standard Configuration...
  • Page 14: A1 Assembling The Base With Ledger Uhv

    Fig. A1.02 under the UH Ledger (4) and secure the decking. 6. Secure Adjustable Base Plate UJB with Spindle Locking UJS (16). (Fig. A1.01d) PERI UP Flex Reinforcement Scaffold 75 and 100 Instructions for Assembly and Use – Standard Configuration...
  • Page 15: Standards And Ledgers

    5. Securely fix wedges for Ledger to Ledger UHA (15). 6. Attach Ledgers UH 75 (3a) and securely fix wedges. 75 cm Fig. A1.03a Fig. A1.03b Fig. A1.03c PERI UP Flex Reinforcement Scaffold 75 and 100 Instructions for Assembly and Use – Standard Configuration...
  • Page 16: Attachment Of Base Level

    5. Secure wedges on all Ledgers using a 500 g hammer. 6. Secure Adjustable Base Plate UJB with Spindle Locking UJS (16). (Fig. A1.04) PERI UP Flex Reinforcement Scaffold 75 and 100 Instructions for Assembly and Use – Standard Configuration...
  • Page 17: Attachment Of Standards And Ledgers

    Locking Pins (17). 4. Attach Ledgers UH (3) and securely fix wedges. 5. Attach Ledgers UH 75 (3a) and se- curely fix wedges. (Fig. A1.05) PERI UP Flex Reinforcement Scaffold 75 and 100 Instructions for Assembly and Use – Standard Configuration...
  • Page 18: Access Decks, Decking And Guardrails

    Securely fix the wedges. (Fig. A1.06) 5. Attach Toeboard UPF (9) on the out- side to the Standards. (Fig. A1.06a) PERI UP Flex Reinforcement Scaffold 75 and 100 Instructions for Assembly and Use – Standard Configuration...
  • Page 19: Stability

    A1.07b) 4. Mount Node Brace UBK (12) below on the Base Standard UVB (2). Fig. A1.07 Fig. A1.07c Fig. A1.07e Fig. A1.07d Fig. A1.07f PERI UP Flex Reinforcement Scaffold 75 and 100 Instructions for Assembly and Use – Standard Configuration...
  • Page 20: A2 Assembly Of Extensions

    2. Tightly connect Standards (6) (6a) by means of Locking Pins (17). 3. Attach Ledgers UH 75 (3a) and securely fix wedges. (Fig. A2.01) Fig. A2.01 PERI UP Flex Reinforcement Scaffold 75 and 100 Instructions for Assembly and Use – Standard Configuration...
  • Page 21: Access Decks, Decking And Guardrails

    Ledger UH. Insert the gravity pin into the holes of the top ledger, turn pin to secure. (Fig. A2.02) PERI UP Flex Reinforcement Scaffold 75 and 100 Instructions for Assembly and Use – Standard Configuration...
  • Page 22: Additional Levels

    ⇒ During work operations, keep the ⇒ hatch closed. Assembly Assembly process is repeated accord- ing to the steps on page 20 and 21. Fig. A2.03 PERI UP Flex Reinforcement Scaffold 75 and 100 Instructions for Assembly and Use – Standard Configuration...
  • Page 23: A3 Pressure-Resistant Ties

    Secure Adjustable Base Plates against falling out. (Fig. A3.01b) Fig. A3.01 PERI UP Flex Reinforcement Scaffold 75 and 100 Instructions for Assembly and Use – Standard Configuration...
  • Page 24: A4 Dismantling

    Fig. A4.01d 2. From a position on the ladder: – Ledger UH on the outside – Close hatch from below (Fig. A4.02) Fig. A4.02 PERI UP Flex Reinforcement Scaffold 75 and 100 Instructions for Assembly and Use – Standard Configuration...
  • Page 25 – Ledger-to-Ledger Coupler UHA Half with Spigot – Ledger UHV 150 Plus – Spindle Locking UJS Fig. A4.04a Fig. A4.04b – Base Standard UVB (Fig. A4.04b) PERI UP Flex Reinforcement Scaffold 75 and 100 Instructions for Assembly and Use – Standard Configuration...
  • Page 26: B1 Assembling The Base With Ledger Uhv

    UH Ledger (5) and se- cure the decking. 6. Secure Adjustable Base Plate UJB with Spindle Locking UJS (16). (Fig. B1.01d) Fig. B1.02 PERI UP Flex Reinforcement Scaffold 75 and 100 Instructions for Assembly and Use – Standard Configuration...
  • Page 27: Standards And Ledgers

    5. Securely fix wedges for Ledg- er-to-Ledger UHA (15). 6. Attach Ledgers UH 75 (3a) and Fig. B1.03 securely fix wedges. 75 cm Fig. B1.03a Fig. B1.03b Fig. B1.03c PERI UP Flex Reinforcement Scaffold 75 and 100 Instructions for Assembly and Use – Standard Configuration...
  • Page 28: Attachment Of Base Level

    5. Secure wedges on all Ledgers using a 500 g hammer. 6. Secure Adjustable Base Plate UJB with Spindle Locking UJS (16). (Fig. B1.04) Fig. B1.04 PERI UP Flex Reinforcement Scaffold 75 and 100 Instructions for Assembly and Use – Standard Configuration...
  • Page 29: Attachment Of Standards And Ledgers

    4. Attach Ledgers UH (3) and securely fix with wedges. 5. Attach Ledgers UH 75 (3a) and securely fix wedges. (Fig. B1.05) Fig. B1.05 PERI UP Flex Reinforcement Scaffold 75 and 100 Instructions for Assembly and Use – Standard Configuration...
  • Page 30: Access Decks, Decking And Guardrails

    7. Insert the gravity pin into the holes of the top Ledger UH (3), turn pin to secure. (Fig. B1.06d + B1.06e) Fig. B1.06b Fig. B1.06d Fig. B1.06c Fig. B1.06e PERI UP Flex Reinforcement Scaffold 75 and 100 Instructions for Assembly and Use – Standard Configuration...
  • Page 31: B2 Assembly Of Extensions

    2. Tightly connect Standards (6) (6a) by means of Locking Pins (17). 3. Attach Ledgers UH 75 (3a) and securely fix wedges. (Fig. B2.01) Fig. B2.01 PERI UP Flex Reinforcement Scaffold 75 and 100 Instructions for Assembly and Use – Standard Configuration...
  • Page 32: Access Decks, Decking And Guardrails

    Ledger UH (3). Insert the gravity pin into the holes of the top Ledger UH (3), turn pin to secure. (Fig. B2.02) PERI UP Flex Reinforcement Scaffold 75 and 100 Instructions for Assembly and Use – Standard Configuration...
  • Page 33: Stability

    Standard with Swivel Cou- pling 48/48 (14a) and at the bottom to the Base Standard using Swivel Cou- pling 48/60 (14b). (Fig. B2.03) Fig. B2.03 PERI UP Flex Reinforcement Scaffold 75 and 100 Instructions for Assembly and Use – Standard Configuration...
  • Page 34: Additional Levels

    5 floors. Max. standing height ≤ 1060 cm. Assembly Assembly process is repeated accord- ing to the steps on page 31 and 32. Fig. B2.04 PERI UP Flex Reinforcement Scaffold 75 and 100 Instructions for Assembly and Use – Standard Configuration...
  • Page 35: B3 Pressure-Resistant Ties

    Secure Adjustable Base Plates against falling out. (Fig. B3.01b) Fig. B3.01 PERI UP Flex Reinforcement Scaffold 75 and 100 Instructions for Assembly and Use – Standard Configuration...
  • Page 36: B4 Dismantling

    Fig. B4.01c Fig. B4.01d 2. From a position on the ladder: – Ledger UH outside – Close hatch from below (Fig. A4.02) Fig. B4.02 PERI UP Flex Reinforcement Scaffold 75 and 100 Instructions for Assembly and Use – Standard Configuration...
  • Page 37: Peri Up Flex Reinforcement Scaffold 75 And

    – Ledger-to-Ledger Coupler UHA Half with Spigot Fig. B4.04a – Ledger UHV 250 Plus – Spindle Locking UJS – Base Standard UVB (Fig. A4.04c) Fig. B4.04b Fig. B4.04c PERI UP Flex Reinforcement Scaffold 75 and 100 Instructions for Assembly and Use – Standard Configuration...
  • Page 38: C1 Overview

    200, 250, 300 75 cm 150 cm Standing height 224 - 260 cm Standing height 424 - 460 cm Standing height 624 - 660 cm PERI UP Flex Reinforcement Scaffold 75 and 100 Instructions for Assembly and Use – Standard Configuration...
  • Page 39: Base Width 250 Cm

    L (cm): 150, 200, 250, 300 75 cm 250 cm Standing height 824 - 880 cm Standing height 1024 - 1080 cm PERI UP Flex Reinforcement Scaffold 75 and 100 Instructions for Assembly and Use – Standard Configuration...
  • Page 40: C2 Actions

    DIN EN 12811-1. according to DIN EN 12811-1. Ledger UHV 250 q = 0.2 kN/m² working wind load according to DIN EN 12811-1. PERI UP Flex Reinforcement Scaffold 75 and 100 Instructions for Assembly and Use – Standard Configuration...
  • Page 41: C3 Reaction Forces

    824 – 860 / (12.2) (5.9) 848 – 880 12.1 1024 – 1060 / (13.7) (6.9) 1048 – 1080 Table C3.01 Scaffold width Base width Fig. C3.01 PERI UP Flex Reinforcement Scaffold 75 and 100 Instructions for Assembly and Use – Standard Configuration...
  • Page 42: C4 Anchors, Anchor Forces

    624 – 660 / (0.5) (1.1) 648 – 680 824 – 860 / (1.1) 848 – 880 1024 – 1060 / (1.1) 1048 – 1080 Table C4.01 PERI UP Flex Reinforcement Scaffold 75 and 100 Instructions for Assembly and Use – Standard Configuration...
  • Page 43: C5 Ballast

    C5 Ballast Required ballast for the PERI UP Flex Reinforcement Scaffold 75 and 100 with working wind speed according to DIN EN 12811. Scaffold width 75 cm Scaffold width 100 cm Bays 1 bay 1 bay Bays Height / bay...
  • Page 44: D1 Moving By Crane

    824 – 860 / (930) (1580) (2230) 848 – 880 1630 2290 1024 – 1060 / (1100) (1880) (2650) 1048 – 1080 Table D1.01 PERI UP Flex Reinforcement Scaffold 75 and 100 Instructions for Assembly and Use – Standard Configuration...
  • Page 45: D2 Working On The Reinforcement Scaffold

    1. One leg is wrapped around the bot- tom Ledger UH. 2. Lean against the top Ledger UH and lean forward. (Fig. D2.03) Fig. D2.03 PERI UP Flex Reinforcement Scaffold 75 and 100 Instructions for Assembly and Use – Standard Configuration...
  • Page 46: D3 Assembly With Guardrail In Advance

    (Fig. D3.06) Ensure that the side protection is com- Fig. D3.04 Fig. D3.05 plete with Ledgers and Toeboards when accessing the top level. Fig. D3.06 PERI UP Flex Reinforcement Scaffold 75 and 100 Instructions for Assembly and Use – Standard Configuration...
  • Page 47: E1 Optional/Alternative Components

    Ledgers UH in the bay of ascent is mounted on the ladder. Fig. E1.01 Bolt ISO 4014 M10 x 70-8.8 Fig. E1.01a PERI UP Flex Reinforcement Scaffold 75 and 100 Instructions for Assembly and Use – Standard Configuration...
  • Page 48: E2 Scaffold Width 100 Cm

    – Access Deck UAL-3 + 1x Steel Deck UDG (10) instead of Access Deck UAL-3 Standing height 224 - 660 cm Fig. E2.01 Fig. E2.01b PERI UP Flex Reinforcement Scaffold 75 and 100 Instructions for Assembly and Use – Standard Configuration...
  • Page 49: Base Width 250 Cm

    – Access Deck UAL-3 + 1x Steel Deck UDG (10) instead of Access Deck UAL-3 Standing height 224 - 1060 cm Fig. E2.02 Fig. E2.02b PERI UP Flex Reinforcement Scaffold 75 and 100 Instructions for Assembly and Use – Standard Configuration...
  • Page 50: E3 Bay Length 300 Cm

    – 2x Steel Deck UDG 25 x 75 (10) The following changes are to be made: – UH 300 Plus instead of Ledger UH 250 Plus Fig. E3.01 Fig. E3.01b PERI UP Flex Reinforcement Scaffold 75 and 100 Instructions for Assembly and Use – Standard Configuration...
  • Page 51: Scaffold Width 100 Cm

    – 1x Steel Deck UDG 25 x 250 (10) The following changes are to be made: – UH 300 Plus instead of Ledger UH 250 Plus Fig. E3.02 Fig. E3.02b PERI UP Flex Reinforcement Scaffold 75 and 100 Instructions for Assembly and Use – Standard Configuration...
  • Page 52: E4 Base Beam Uva

    8. Secure Adjustable Base Plate UJB with Spindle Locking UJS (16). (Fig. E4.01) 9. Additional assembly as described in Sections B1 - B3. (Fig. E4.02) Fig. E4.02 PERI UP Flex Reinforcement Scaffold 75 and 100 Instructions for Assembly and Use – Standard Configuration...
  • Page 53: E5 Hatch Uaf

    5. Attach Ladder UAF (22). (Fig. E5.02) 6. Additional assembly as described in Fig. E5.01 Sections A1 - A3 or B1 - B3. Fig. E5.02 PERI UP Flex Reinforcement Scaffold 75 and 100 Instructions for Assembly and Use – Standard Configuration...
  • Page 54: E6 Coupler Braces Ubc

    Mount Coupler Brace UBC (23) at the top to the outside Standard. Mount at bottom with Swivel Coupling 48/60 (14b) to the Base Standard UVB 24. (Fig. E6.01) Fig. E6.01 PERI UP Flex Reinforcement Scaffold 75 and 100 Instructions for Assembly and Use – Standard Configuration...
  • Page 55: E7 External Stairs

    As an alternative to the Access Deck UAL-3 and UAF-3, stairs can be mount- ed to the outside of the reinforcement scaffold. (Fig. E7.01) Fig. E7.01 PERI UP Flex Reinforcement Scaffold 75 and 100 Instructions for Assembly and Use – Standard Configuration...
  • Page 56: Peri Up Flex Reinforcement Scaffold 75 And

    PERI UP Flex Reinforcement Scaffold 75 and 100 Item no. Weight kg Reinforcement Scaffold UDI/UDG Basic 001090 326.698 Reinforce. Scaff. UDI/UDG Basic 200 x 150/75 2000 001094 358.268 Reinforce. Scaff. UDI/UDG Basic 250 x 150/75 2500 001098 390.268 Reinforce. Scaff. UDI/UDG Basic 300 x 150/75...
  • Page 57 PERI UP Flex Reinforcement Scaffold 75 and 100 Item no. Weight kg Reinforcement Scaffold UDI/UDG Add. 001107 164.328 Reinforce. Scaff. UDI/UDG Add. 150 x 150/75 1500 001092 178.038 Reinforce. Scaff. UDI/UDG Add. 200 x 150/75 2000 001096 198.628 Reinforce. Scaff. UDI/UDG Add. 250 x 150/75...
  • Page 58 PERI UP Flex Reinforcement Scaffold 75 and 100 Item no. Weight kg Reinforcement Scaffold UDI/UDG Basic 001109 372.100 Reinforce. Scaff. UDI/UDG Basic 200 x 150/100 2000 001113 410.390 Reinforce. Scaff. UDI/UDG Basic 250 x 150/100 2500 001117 449.310 Reinforce. Scaff. UDI/UDG Basic 300 x 150/100...
  • Page 59 PERI UP Flex Reinforcement Scaffold 75 and 100 Item no. Weight kg Reinforcement Scaffold UDI/UDG Add. 001121 169.958 Reinforce. Scaff. UDI/UDG Add. 150 x 150/100 1500 001111 193.558 Reinforce. Scaff. UDI/UDG Add. 200 x 150/100 2000 001115 216.848 Reinforce. Scaff. UDI/UDG Add. 250 x 150/100...
  • Page 60 PERI UP Flex Reinforcement Scaffold 75 and 100 Item no. Weight kg Reinforcement Scaffold UDI/UDG Basic UVA 001123 401.134 Reinforce. Scaff. Basic UVA 200 x 250/75 2000 001125 431.384 Reinforce. Scaff. Basic UVA 250 x 250/75 2500 001127 462.064 Reinforce. Scaff. Basic UVA 300 x 250/75 3000 Reinforcement Scaffold UDI/UDG Add.
  • Page 61 PERI UP Flex Reinforcement Scaffold 75 and 100 Item no. Weight kg Reinforcement Scaffold UDI/UDG Basic UVA 001130 449.856 Reinforce. Scaff. Basic UVA 200 x 250/100 2000 001132 486.826 Reinforce. Scaff. Basic UVA 250 x 250/100 2500 001134 524.426 Reinforce. Scaff. Basic UVA 300 x 250/100 3000 Reinforcement Scaffold UDI/UDG Add.
  • Page 62 PERI UP Flex Reinforcement Scaffold 75 and 100 Item no. Weight kg 100242 4.570 Adj. Base Plate UJB 38-80/55 Note With captive yellow Quick Jack Nut. Ø Ø10 Ø17 100411 3.390 Adj. Base Plate UJB 38-50/30 Note With captive red Quick Jack Nut.
  • Page 63 PERI UP Flex Reinforcement Scaffold 75 and 100 Item no. Weight kg Standards UVR 100009 10.000 Standard UVR 200 100012 14.700 Standard UVR 300 Ø13 Ø 48,3 Ø11 100000 4.610 Top Standard UVH 100 Without spigot for supporting head spindles.
  • Page 64 PERI UP Flex Reinforcement Scaffold 75 and 100 Item no. Weight kg Ledgers UH Plus 114595 2.070 Ledger UH 50 Plus Ledger UH 75 Plus 114629 2.730 114632 4.390 Ledger UH 100 Plus 1000 114641 4.710 Ledger UH 150 Plus...
  • Page 65 PERI UP Flex Reinforcement Scaffold 75 and 100 Item no. Weight kg 100870 40.700 Base Beam UVA 250 For free-standing and mobile scaffold units. For symmetric and antimetric assembly of UP T 72/T 104 and Rosett 72, 75, 100, 104 and symmetric assembly of Rosett b = 75, 100, 150, 200 and 250 cm.
  • Page 66 PERI UP Flex Reinforcement Scaffold 75 and 100 Item no. Weight kg Ledger UHV 409107 10.900 Ledger UHV 150 1454 1500 409109 18.000 Ledger UHV 250 2454 2500 For high loads, e.g. material storage. Note Ledgers UHV can be replaced by ledgers UHV Plus.
  • Page 67 PERI UP Flex Reinforcement Scaffold 75 and 100 Item no. Weight kg 100416 9.520 Coupler Brace UBC 150/200 For special applications. For connecting to Scaffold Tube Ø 48 mm. Ø48,3 1500 Node Brace UBK 124170 6.770 Node Brace UBK 75/200...
  • Page 68 PERI UP Flex Reinforcement Scaffold 75 and 100 Item no. Weight kg Steel Decks UDG 25 perm. p [kN/m²] max. p [kN/m²] 124121 5.260 Steel Deck UDG 25 x 75 40.0 124118 6.630 Steel Deck UDG 25 x 100 1000 40.0...
  • Page 69 PERI UP Flex Reinforcement Scaffold 75 and 100 Item no. Weight kg Access Decks UAL-3 126393 15.600 Access Deck UAL-3, 75 x 150/3 1500 126392 19.600 Access Deck UAL-3, 75 x 200/3 2000 126314 23.500 Access Deck UAL-3, 75 x 250/3...
  • Page 70 PERI UP Flex Reinforcement Scaffold 75 and 100 Item no. Weight kg 109879 3.820 Ladder UAF 200, Alu For mounting to Hatch UAF . 6 x 280 = 1680 2170 Toeboards Wood UPF 129498 3.320 Toeboard Wood UPF 150 1495...
  • Page 71 PERI UP Flex Reinforcement Scaffold 75 and 100 Item no. Weight kg Toeboards Steel UPY, galv. 123694 3.000 Toeboard Steel UPY 150, galv. 1486 1500 123696 4.030 Toeboard Steel UPY 200, galv. 1986 2000 123698 5.060 Toeboard Steel UPY 250, galv.
  • Page 72 PERI UP Flex Reinforcement Scaffold 75 and 100 Item no. Weight kg Guardrails EPG 130195 2.480 Guardrail EPG 150 1565 1500 130197 3.280 Guardrail EPG 200 2065 2000 130199 4.090 Guardrail EPG 250 2565 2500 130201 4.890 Guardrail EPG 300...
  • Page 73 PERI UP Flex Reinforcement Scaffold 75 and 100 Item no. Weight kg 111053 0.059 Locking Pin Ø 48/57 As tension-proof connection of standards with a diameter of 48 up to 57 mm. Ø10 Bolt ISO 4014 M10 x 70-8.8 MU 100719 0.060...
  • Page 74 PERI UP Flex Reinforcement Scaffold 75 and 100 Item no. Weight kg 100742 10.000 Stair Guardrail UAG Suitable for Staircases UAS 64 x 250/200, UAS 64 x 300/200, UAS 75 x 250/200 and UAS 75 x 300/200 as internal and external guardrail.
  • Page 75 PERI UP Flex Reinforcement Scaffold 75 and 100 Item no. Weight kg 113832 0.035 PERI UP Scaffold Tag To cordon off scaffolding areas not yet authorized for use. With the exception of inserting the PERI UP Assembly Certificate. Neue Gruppe...
  • Page 76 152 mm x 120 mm x 6 mm 2 holes Hole for suspended scaffold 1 hole perm. F up to 15 kN when fixed 1x (see "PERI UP components") perm. F up to 20 kN when fixed 1x perm. F up to 31 kN when fixed 2x Marking none striped band at the top and bottom Geometrically and statically* combinable in the system.
  • Page 77 PERI UP Flex – 2 generation Top Standard UVH Top Standard UVH-2 Tube RO 48.3 mm x 3.2 mm RO 48.3 mm x 3.2 mm Rosette 160 mm x 130 mm x 8 mm 152 mm x 120 mm x 6 mm 2 holes Hole for suspended scaffold 1 hole perm. F up to 15 kN when fixed 1x (see "PERI UP components") perm. F up to 20 kN when fixed 1x perm.
  • Page 78 PERI UP Flex – 2 generation Horizontal Ledger UHV Plus Horizontal Ledger UHV-2 2 x 3, for assembly of up to three Ledger Braces UBL When installing only one ledger brace preferably use the middle assembly 2 x 1, for assembly of a UBL assembly points point. Ledger Brace UBL Ledger Braces UBL can be mounted at very flat installation angles using the middle assembly point only.
  • Page 79 PERI UP Flex – 2 generation Ledger Brace UBL Ledger Brace UBL-2 UBL Mounting Lug points in the longitudinal direction points in the transverse direction Combinability Geometrically and statically combinable in the system. Marking none Band at the top and bottom Swivel in to install (less lateral space Handling Tilt in to install.
  • Page 80 132239 11.700 Standard UVR-2 300 3,000 Ø13 Ø Ø11 132196 6.060 Top Standard UVH-2 125 Without pin for supporting head spindles. Reduces necessary spindle extensions with 25 cm rosette spacing. Ø 48,3 Ø11 PERI UP Flex – 2 generation Supplement to the Instructions for Assembly and Use...
  • Page 81 Horizontal Ledger UHV-2 200 1,954 2,000 137030 15.200 Horizontal Ledger UHV-2 250 2,454 2,500 Horizontal Ledger UHV-2 300 137035 18.500 2,954 3,000 For high loads, e.g. in the case of material storage. Ø22 40/20 PERI UP Flex – 2 generation Supplement to the Instructions for Assembly and Use...
  • Page 82 6.72 Node Brace UBK-2 250/200 3,226 2,500 2,000 133457 6.60 Node Brace UBK-2 300/100 3,131 3,000 1,000 133460 6.96 Node Brace UBK-2 300/150 3,356 3,000 1,500 133463 7.42 Node Brace UBK-2 300/200 3,625 3,000 2,000 Ø38 PERI UP Flex – 2 generation Supplement to the Instructions for Assembly and Use...
  • Page 83 Ledger Brace UBL-2 300/ 50 132827 5.90 2,795 3,000 132829 6.16 Ledger Brace UBL-2 300/100 2,926 3,000 1,000 Ledger Brace UBL-2 300/150 132831 6.57 3,133 3,000 1,500 Ledger Brace UBL-2 300/200 132833 7.10 3,400 3,000 2,000 Ø42,4 PERI UP Flex – 2 generation VIII Supplement to the Instructions for Assembly and Use...
  • Page 84 Bridge Formwork Tunnel Formwork Shoring Systems Construction Scaffold Facade Scaffold Industrial Scaffold Access Protection Scaffold Safety Systems System-Independent Services Accessories PERI GmbH Formwork Scaffolding Engineering Rudolf-Diesel-Strasse 19 89264 Weissenhorn Germany Tel. +49 (0)7309.950-0 Fax +49 (0)7309.951-0 info @ peri.com www.peri.com...