Hardware Design Files
Designator
Qty
R6
1
R7
1
R8
1
R9
1
SH-J1, SH-J2
2
U1
1
U2
1
U3
1
2
2
4
4
12
REF80 Evaluation Module
Table 4-1. Bill of Materials (continued)
Description
RES, 39.0 k, 1%, 0.1 W, 0603
RES, 3.3 k, 5%, 0.1 W, 0603
RES, 100, 1%, 0.25 W, AEC-Q200 Grade 0, 1206
RES, 1.1 k, 5%, 0.25 W, AEC-Q200 Grade 0, 1206
CONN JUMPER S2 (1 x 2) Position Shunt
Connector Black Open Top 0.100" (2.54mm)
GoldHORTING .100" GOLD
Temperature Compensated Buried Zener Reference
With 0.1ppm/°C Drift and 9ppm Stability
3-Terminal Adjustable Regulator, 4-pin SOT-223, Pb-
Free
Vin 3V to 36V, 150mA, Ultra-Low-Noise, High-PSRR
Low-Dropout (LDO) Linear Regulator, DRB0008A
(VSON-8)
Polycarbonate Spacer
Polycarbonate Cover
M3x0.5 Hex Nut 0.217" (5.51mm) Nylon
M3x0.5 Pan Head Machine Screw Slotted Drive
Nylon
Copyright © 2024 Texas Instruments Incorporated
Package Reference
Part Number
0603
RC0603FR-0739KL
0603
RC0603JR-073K3L
1206
CRCW1206100RFKEA
1206
CRCW12061K10JNEA
JUMPER
QPC02SXGN-RC
LCCC20
REF80000A1NAJ
DCY004A
LM317AEMP/NOPB
DRB0008A
TPS7A4901DRBR
PN 3124
PN 3125
4688
50M030050N020
SNAU304A – AUGUST 2024 – REVISED OCTOBER 2024
www.ti.com
Manufacturer
Yageo
Yageo
Vishay-Dale
Vishay-Dale
Sullins
Texas Instruments
Texas Instruments
Texas Instruments
Envision Plastics & Design
Envision Plastics & Design
Keystone Electronics
Essentra Components
Submit Document Feedback
Need help?
Do you have a question about the REF8EVM and is the answer not in the manual?