Equipment Checklist; Optional Rack-Mounting Equipment - SMC Networks SMCGS10P-SMART Installation Manual

Ez switch 10/100/1000 web smart 10-port gigabit ethernet poe switch
Hide thumbs Also See for SMCGS10P-SMART:
Table of Contents

Advertisement

E
QUIPMENT
After unpacking this switch, check the contents to be sure you have received all
the components. Then, before beginning the installation, be sure you have all
other necessary installation equipment.
Web Smart 10-Port GE PoE Switch
Four adhesive foot pads
Grounding screw
Bracket Mounting Kit containing two brackets and eight screws for attaching
the brackets to the switch
Power Cord
This Installation Guide
Documentation CD (Includes Management Guide)
O
R
PTIONAL
If you plan to rack-mount the switch, be sure to have the following equipment
available:
Four mounting screws for each device you plan to install in a rack—these
are not included
A screwdriver (Phillips or flathead, depending on the type of screws used)
C
HECKLIST
-M
ACK
OUNTING
C
HAPTER
E
QUIPMENT
– 38 –
| Installing the Switch
3

Equipment Checklist

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SMCGS10P-SMART and is the answer not in the manual?

Questions and answers

Table of Contents