Important – Read this -
All electrical contacts are checked at the factory during the
final production test, but upon installation of the boiler it is
necessary to carry out initial maintenance of the contacts due
to the
possibility of their loosening during the transport of the boiler.
The first (initial) inspection of the device must be performed 3
months after the start of the device's operation, after which
maintenance is performed every 6
months.Due to the flow of electric
current through the contacts, heat dissipation occurs in them, which
over time leads to a weakening of the contact connection.
During the operation of the device, vibrations occur due to the
assembly of the switching devices, which further reduces the force
betweenthe contacts.Even if the boiler is not in operation, the contacts
can also release themselves, which can also cause increased
heating of the contacts and cause damage to the device.
For the boiler to work properly, and to prevent possible damage to the
contacts, it is mandatory to periodically maintain the contacts of all
elements of the electrical part of the boiler.
Guidebook for installation, handling and maintenance – ENG
FHEB 120 - 240kW
Electric hot water boiler for heating systems with thermoregulatory microprocessor
FHEB 120 - 240kW-04/2024
Need help?
Do you have a question about the FH120EB and is the answer not in the manual?
Questions and answers