Page 1
The intention of this schedule is to provide information for the correct servicing procedure of the Stannah Stairiser to ensure that the product runs safely, smoothly and efficiently. Owing to our policy of continual product development, we reserve the right to alter or amend any of the contents at any time without prior notice.
Page 2
Stannah Stairiser maintenance schedule The following schedule, details the recommended periodic maintenance programme of the Stannah stairiser. This schedule has been designed for use by your Stannah approved engineers/technicians who have completed the recognised product training course. Safety The stairiser must be isolated from the mains electricity supply before the removal of any covers prior to commencing the maintenance programme.
Page 3
& carriage Debri and dirt Check within the underpan for any loose debri and dust and dirt build-up. Overall Condition Check and report the overall condition of the platform. 120710/L:\Tech documents\Stairiser SX\maintenance manual\manual 120710.doc ..\drawings 210206.pdf...
Page 4
Inspect wiring and connections for signs of wear/damage. Debris and dirt Check within the carriage for any loose debri and dust and dirt build-up. Overall Condition Check and report the overall condition of the carriage. 120710/L:\Tech documents\Stairiser SX\maintenance manual\manual 120710.doc ..\drawings 210206.pdf...
Need help?
Do you have a question about the Stairiser SX and is the answer not in the manual?
Questions and answers