Page 1
ASSEMBLY INSTRUCTIONS METAL GARDEN SHED SKU: T-PS23-0355 Store Your Patio Well Metal Garden House Installation Tutorial https://www.patiowell.com/ pages/video-t-ps23-0355a www.patiowell.com saleservice@patiowell.com...
Page 2
SITE PREPARATION Level the ground surface. Recommendation: Construct a wooden or concrete base as a foundation. BEFORE STARTING ASSEMBLY Remove all of the pieces from the 3 packages and spread them out on the ground. Before installation, please check the type and quantity of parts first. It is recommended to use a clean work surface to spread the parts out and for pre-assembly steps.
Page 3
Requires two people and takes 2-3 hours for Installation. Recommended to wear gloves to avoid scratches. Please read the manual carefully before installation. DO NOT RETURN YOUR UNIT TO THE STORE Contact us first saleservice@patiowell.com...
Page 15
STEP 11 BE 1 BE1L F1 X80 V2 X80 STEP 12 F1 X32 V2 X32...
Page 16
STEP 13 WS3A WS3A F1 X4 V2 X4 STEP 14 WS3A Note: The door frame (ULA,UR1) should cover the raised part on the wall panel, not insert. F1 X8 V2 X4...
Page 17
STEP 15 F2 X12 V2 X8 STEP 16 Note: M15 is pressed into M14...
Page 18
STEP 17 Don't tighten these two screws too tightly Don't tighten these two screws too tightly F2 X12 STEP 18 F2 X8...
Page 19
STEP 19 F1 X24 V2 X24 STEP 20 Tighten all screws F2 X12...
Page 20
STEP 21 F1 X147 V2 X147 STEP 22 F1 X1 V2 X1...
Page 21
STEP 23 F1 X2 V2 X2 STEP 24 Installation tips : You need to gently lift the 19 and then screw it. F1 X33 V2 X33...
Page 22
STEP 25 When installing the hole at the bottom of 19, 19 needs to be moved or lifted F1 X8 V2 X8 STEP 26 F1 X6...
Page 32
CARE & SAFETY • In case of fire, do not attempt to extinguish any burning polypropylene with water Unsuitable for storage of flammable or corrosive substances. • It is of utmost importance to assemble all of the parts according to the directions. Do not skip any step.
Need help?
Do you have a question about the T-PS23-0355 and is the answer not in the manual?
Questions and answers