Patiowell T-PS23-0406 Assembly Instructions Manual

Patiowell T-PS23-0406 Assembly Instructions Manual

Metal garden shed
Hide thumbs Also See for T-PS23-0406:

Advertisement

BE
YOUR
LIFE BU ILDER
www.patiowell.com
ASSEMBLY INSTRUCTIONS
METAL
GARDEN SHED
SKU: T-PS23-0406
Metal Garden House
Installation Tutorial
https://www.patiowell.com/pages/
video-T-PS23-0406A
saleservice@patiowell.com

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the T-PS23-0406 and is the answer not in the manual?

Questions and answers

Virginia Cook
May 18, 2025

NO traía manual de instrucciones Y el PDF Los números y letras del manual no coinciden **** las letras y números de los stikers que traen pegados en las láminas. Son otros diferentes

1 comments:
Mr. Anderson
May 23, 2025

The correct instructions for the Patiowell T-PS23-0406 include multiple steps involving components such as F1, F2, V2, and structural parts labeled P1, P2, P3, etc. Specific instructions include:

- Do not overtighten screws labeled F2 during steps 23–25.
- Tighten all screws in step 26.
- Avoid installing F1 and V2 in holes near the outer side of P1 and P2 in step 27.
- Steps 28–34 involve assembling parts such as GC, GE, DX2, DLA, DRA, DRB, and others using screws like F1, F2, F3, and F5.

The numbers and letters in the manual may not match the stickers on the sheets due to inconsistencies in labeling or updates in design that were not reflected in the printed stickers or manual.

This answer is automatically generated

Subscribe to Our Youtube Channel

Summary of Contents for Patiowell T-PS23-0406

  • Page 1 ASSEMBLY INSTRUCTIONS METAL GARDEN SHED SKU: T-PS23-0406 YOUR LIFE BU ILDER Metal Garden House Installation Tutorial https://www.patiowell.com/pages/ video-T-PS23-0406A www.patiowell.com saleservice@patiowell.com...
  • Page 2: Site Preparation

    SITE PREPARATION Level the ground surface. Recommendation: Construct a wooden or concrete base as a foundation. The external dimensions of the product : 76.2’’ 118’’ 120.8’’...
  • Page 3: Before Starting Assembly

    Requires two people and takes 2-3 hours for Installation. Recommended to wear gloves to avoid scratches. Please read the manual carefully before installation. DO NOT RETURN YOUR UNIT TO THE STORE Contact us first saleservice@patiowell.com...
  • Page 4 FOUNDATION 1 X2 2 X2 BS1L X1 BS1 X1 BS2L X1 BS2 X1 PLATES 21L X2 W1A X22 WS2A X4 WS3A X2 21R X2 P1 X2 P3 X4 P3A X4 P2 X2 P4 X2 P5 X2...
  • Page 5 PLATES DLA X1 DLB X1 DRB X1 DRA X1 STRIPS DX2 X4 ULA X1 UR1 X1 7 X1 8 X1 9 X4 10L X1 10R X1...
  • Page 6 STRIPS 13 X4 14 X4 15 X2 16 X2 17 X2 18 X2 19 X2 20 X4 GS X2 C5 X4 C4LX2 C4R X2...
  • Page 7 STANDARD DG X1 DF X1 DC X2 DH X4 C2 X4 GF X4 GR X2 GC X4 S1 X120 V2 X418 SCREW inch inch F1(X519) M4*10 F2(X52) M4*10 inch inch F3(X32) M5*12 F4(X5) M6*10 For GC inch F5(X4) M4*16...
  • Page 8 WS2A WS2A WS2A WS3A WS3A WS2A BS2L BS1L...
  • Page 9 CONTENTS Bottom frame 10-12 (page) Wall 12-20 (page) Roof 21-30 (page) Door 31-37 (page)
  • Page 10 ATTENTION For this step only, To ensure a better understanding and installation experience, please Scan The QR Code next to it to watch a video tutorial that will assist you in completing the installation. https://www.patiowell.com/pages/ video-t-ps22-0096-8?step1 STEP 1 BS1L BS1L...
  • Page 11 STEP 2 BS2L BS2L BS2L F1 X2 STEP 3 BS2L BS2L BS2L BS1L F1 X12...
  • Page 12 STEP 4 F1 X4 STEP 5 Tips: Align the gasket with the hole, and then use the electric drill to drill the V2 into the hole.
  • Page 13 STEP 6 WS2A WS2A WS2A WS2A WS2A BS1L F1 X16 V2 X16 STEP 7 BS1L F1 X16 V2 X16...
  • Page 14 ATTENTION For this step only, To ensure a better understanding and installation experience, please Scan The QR Code next to it to watch a video tutorial that will assist you in completing the installation. https://www.patiowell.com/pages/ video-t-ps22-0096-8?step2 STEP 8...
  • Page 15 STEP 9 × Note: Connector must fit. STEP 10 The hole position on No. 9 pole is replaced by slot. BS1L F1 X20 V2 X20...
  • Page 16 STEP 11 F1 X4 STEP 12 BS1L F1 X6 V2 X6...
  • Page 17 STEP 13 F1 X4 STEP 14 BS1L F1 X6 V2 X6...
  • Page 18 ATTENTION For this step only, To ensure a better understanding and installation experience, please Scan The QR Code next to it to watch a video tutorial that will assist you in completing the installation. https://www.patiowell.com/pages/ video-t-ps22-0096-8?step3 STEP 15 BS1L In order to facilitate the...
  • Page 19 STEP 16 BS1L F1 X40 V2 X40 STEP 17 F1 X48 V2 X48...
  • Page 20 STEP 18 BS1L WS3A WS3A BS1L F1 X20 V2 X20 STEP 19 BS1L Tips: Insert ULA and UR1 between the top beam and bottom frame respectively, and then push them to the F1 X8 V2 X8 corresponding position.
  • Page 21 ATTENTION For this step only, To ensure a better understanding and installation experience, please Scan The QR Code next to it to watch a video tutorial that will assist you in completing the installation. https://www.patiowell.com/pages/ video-t-ps22-0096-8?step4 STEP 20 F2 X20...
  • Page 22 STEP 21 Four screws in the middle can be installed first to facilitate fixation. BS1L BS1L F1 X32 V2 X32...
  • Page 23 ATTENTION For this step only, To ensure a better understanding and installation experience, please Scan The QR Code next to it to watch a video tutorial that will assist you in completing the installation. https://www.patiowell.com/pages/ video-t-ps22-0096-8?step5 STEP 22 Note: 14 is pressed into 13.
  • Page 24 STEP 23 Don't tighten these two screws too tightly. Don't tighten these two screws too tightly. F2 X12 STEP 24 F2 X4...
  • Page 25 STEP 25 F2 X8 STEP 26 Tighten all screws. F2 X8...
  • Page 26 ATTENTION For this step only, To ensure a better understanding and installation experience, please Scan The QR Code next to it to watch a video tutorial that will assist you in completing the installation. https://www.patiowell.com/pages/ video-t-ps22-0096-8?step6 STEP 27 Note: Do not install F1 and V2 in the holes near the outer side of P1,P2.
  • Page 27 STEP 28 F1 X57 V2 X57 STEP 29 F1 X1 V2 X1...
  • Page 28 STEP 30 F1 X2 V2 X2 STEP 31 Installation tips : You need to gently lift the 19 and then screw it. F1 X33 V2 X33...
  • Page 29 ATTENTION For this step only, To ensure a better understanding and installation experience, please Scan The QR Code next to it to watch a video tutorial that will assist you in completing the installation. https://www.patiowell.com/pages/ video-t-ps22-0096-8?step7 STEP 32 Note: Do not install F1 and V2 in the holes near the outer side of P1,P2.
  • Page 30 STEP 33 F1 X6 V2 X6 STEP 34 F1 X6 V2 X6 F5 X4...
  • Page 31 ATTENTION For this step only, To ensure a better understanding and installation experience, please Scan The QR Code next to it to watch a video tutorial that will assist you in completing the installation. https://www.patiowell.com/pages/ video-t-ps22-0096-8?step8 STEP 35...
  • Page 32 STEP 36 The other door operates the same way V2 X 2 F2 X 2 STEP 37 The other door operates the same way F1 X 4...
  • Page 33 STEP 38 inside F1 X 4 F3 X8...
  • Page 34 STEP 39 F1 X 8...
  • Page 35 STEP 40 outside F1 X 8 V2 X 8 F4 X 2 STEP 41 outside F1 X8 V2 X8 F4 X3...
  • Page 36 ATTENTION For this step only, To ensure a better understanding and installation experience, please Scan The QR Code next to it to watch a video tutorial that will assist you in completing the installation. https://www.patiowell.com/pages/ video-t-ps22-0095-gy?step=9...
  • Page 37 STEP 42 F3 X16 S1 X104...
  • Page 38: Care And Safety

    CARE & SAFETY • In case of fire, do not attempt to extinguish any burning polypropylene with water Unsuitable for storage of flammable or corrosive substances. • It is of utmost importance to assemble all of the parts according to the directions. Do not skip any step.

Table of Contents

Save PDF