Installation: Start Up
Plug Case In/Turn On Main Power Switch:
•
Do not use an extension cord with this case.
•
Do not operate this equipment with a damaged cord,
plug, or outlet.
•
Ensure that the main power switch is off.
•
Route the power cord through the appropriate knockout
in the rear panel. Install the supplied cord bushing in the
knockout hole. Do not install cord without bushing.
•
Plug the cord into a certified 120V electrical outlet with
ground.
•
Turn the main power switch on.
•
Coil fans should turn on.
•
From inside of the case, check for discharge air from
front baffle, to confirm that the fans are functioning
properly.
•
When the case is in a start-up mode or has been idle for
a long period of time, the case may require 75 minutes
running time to pull down the temperature.
•
Turn lights on.
•
Light switch is located on the ceiling of merchandising
area.
•
The lights should come on at the same time.
•
Always maintain front and rear airflow clearance of four
inches.
•
Obstruction or restriction of air can void warranty.
•
Note: Case temperature setting is determined by case
size. Temperature is controlled by a thermostat.
Fusion® User Manual
Fusion® User Manual
Main Power Switch
Light Switch
8
8
Need help?
Do you have a question about the Fusion GHS456R and is the answer not in the manual?