NewLine TradePro Curved Instruction Manual

Advertisement

Important!
1. When you receive your Newline shower, check contents for any freight damage.
2. Advise Newline on 0508 639 5463 if any damage has occurred or a defect
identified within 8 hours of receiving the goods so this can be rectified.
3. Do not install any faulty product as this will invalidate later claims.
0224
TradePro Curved
INSTRUCTION MANUAL

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TradePro Curved and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for NewLine TradePro Curved

  • Page 1 1. When you receive your Newline shower, check contents for any freight damage. 2. Advise Newline on 0508 639 5463 if any damage has occurred or a defect identified within 8 hours of receiving the goods so this can be rectified.
  • Page 2: Before You Start

    • Mark gas/water pipe and electrical wire locations to ensure these are not touched. WARRANTY • This covers faulty goods but not breakages. View newline.nz for information. • Compliance with Acrylic Pre-install Speci cations and these instructions are essential for a valid warranty.
  • Page 3: Assembly Diagram

    ASSEMBLY DIAGRAM Before commencing installation, please ensure you have the following components in your package to complete installation. [ 1 ] [ 2 ] [13 ] [11 ] [ 3 ] [10 ] [ 4 ] [ 7 ] [12 ] [ 5 ] [ 8 ] [15 ]...
  • Page 4 PLAN Diagram A WALL CHANNEL WALL CHANNEL 13mm IMPORTANT: Position the wall channels at 13mm off the acrylic tray edge (Diagram A). This will allow for walls out of plumb protruding or curving inwards up to 4mm. Greater variations to plumb will require recalculated reduction of Diagram A.
  • Page 5: Installation

    INSTALLATION Mark out the positioning of the wall profiles (refer to the Layout Plan on page 4 for measurements). Using a soft pencil or masking tape mark up the walls with a spirit level. Use the wall channel holes to pre-drill a 2mm lead hole in the lining.
  • Page 6 INSTALLATION Fit the frame into the wall channels. Tip: Compressing the frame over wall channel can be made easier by the following steps: B. Fit one side offset to the channel as diagram. C. Fit other side correctly into the opposite channel. D.
  • Page 7 INSTALLATION Adjust the sliding doors as shown in the illustration below. ADJUST THE SLIDING DOORS USING THE SCREWS LOCATED ON THE BOTTOM OF TOP ROLLER ASSEMBLIES. ADJUST ROLLERS SO THAT THE SLIDING DOORS ARE PARALLEL TO EACH OTHER. NOTE: DO NOT OVER TIGHTEN TOP ROLLERS AS THIS WILL CAUSE THE BOTTOM ROLLERS TO JAM AND BREAK.
  • Page 8 Apply silicone to outer line as indicated. Seal the join between wall profile and frame, 150mm up from base on both sides. CONTACT 54 Unutoto Place, Tauriko, Tauranga, 3171 Freephone: 0508 639 5463 Phone: 09 444 2053 Email: info@newline.co.nz newline.nz...

Table of Contents