Page 1
1. When you receive your Newline shower check contents for any freight damage. 2. Advise Newline on 0508 639 5463 if any damage has occurred or a defect identified within 8 hours of receiving the goods so this can be rectified.
TRADEPRO SHOWER UNIT 2-SIDED & ALCOVE APPLICATIONS WARRANTY Faulty goods are covered under warranty. Visit www.newline.co.nz for warranty information. Breakages incurred during construction are not covered under warranty. Installations must conform to the instructions to be covered by the warranty.
ASSEMBLY DIAGRAM Before commencing installation, please ensure you have the following components in your package to complete installation. REF TICK DESCRIPTION PART NO. Door assembly wall channel PAR5063 Return panel wall channel PAR5209 Fixed return panel Door front assembly Handle set K9751 Fixed panel screws 4x10mm Fixed panel screw caps...
Page 4
LAYOUT PLAN A WALL WALL CHANNEL CHANNEL 22mm IMPORTANT: 1. Position the wall profiles at 22mm off the acrylic tray edge. 2. Recalculate the specific position if tray is not level, walls are out of plumb protruding or curving inwards more than 5mm. INSTALLATION STEPS: PAGE 6 TO 9 MINIMUM AND MAXIMUM TABLE Wall out of plumb will not allow the full minimum / maximum range.
Page 5
LAYOUT PLAN B - TRADEPRO ALCOVE (DOOR ONLY) OPTION B: TRADEPRO ALCOVE (DOOR ONLY) Applies to 900 and 1000mm door sizes with acrylic base applications. Dotted Line: Outer boundary THIS IS A BRIEF OVERVIEW OF HOW TO SET UP A DOOR ASSEMBLY ONLY.
INSTALLATION Go to the layout plan on pages 4 and 5 to identify the category and size of shower you are installing. Find the applicable measurements and guidance notes that apply in your case. Using a soft pencil or masking tape mark out the outside boundary line on the base and up the walls with a spirit level.
Page 7
INSTALLATION Slide the Return Panel (3) over the extrusion on to the Front Door Assembly (4) at the leading corner. Ensure this is aligned correctly then drilled and screwed. DIAGRAM C: Using the sliding rails within the Front Door Assembly adjust them (in or out) to have both the Fixed Return Panel and Front Door Panel positioned on the boundary line.
Page 8
INSTALLATION Drill three equally spaced 3.2mm holes into the wall channels (1) and (2) on the INSIDE of the screen. Make sure that your drill holes are more than 20mm back from the glass edge when using the smallest screen size. Otherwise you risk breaking the glass (see Diagram E). Make sure that all the holes go though both the aluminium of the fixed side panel and the door front assembly.
Page 9
The screen is designed to allow the water to return into the shower area, if any is present. SCREENS THAT ARE SEALED ON THE INSIDE WILL VOID WARRANTY. CONTACT Freephone: 0508 639 5463 Phone: 09 444 2053 Fax: 09 443 0044 Email: info@newline.co.nz www.newline.co.nz...
Need help?
Do you have a question about the TradePro and is the answer not in the manual?
Questions and answers