Advertisement

Quick Links

Important

0923
INSTRUCTION MANUAL
Aston
1. When you receive your Aston shower, check contents for
any freight damage or defect.
2. If this is a custom order, the size will be on the outside of
the box. Check if this is correct.
3. Advise Newline on 0508 639 5463 if any damage has
occured or questions on the size within 8 hours of receiving
the goods so this can be rectified.
4. Do not install any faulty product as this will invalidate later
claims.
2-Sided &
3-Sided Alcove

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Aston and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for NewLine Aston

  • Page 1 INSTRUCTION MANUAL Aston 3-Sided Alcove 1. When you receive your Aston shower, check contents for any freight damage or defect. 2. If this is a custom order, the size will be on the outside of the box. Check if this is correct.
  • Page 2 3. Two persons for heavy glass lifting especially fitting/installing into channels. 4. Wear appropriate protective clothing, gloves, and eye protection during installation. WARRANTY • This covers faulty goods. Visit newline.nz for details. • Installation instructions must be followed for the warranty to be valid. ATTENTION 1.
  • Page 3 1. Clean tiles where channels are to be laid. 2. From specification sheet in your kit, layout wall channels, floor channels and mark positions. 3. Place self-adhesive blocks to hold floor channels as arrows. *Wall to Floor Connector Not Supplied by Newline...
  • Page 4 PROCESS Channel Bonding DIAGRAM 2 When all bonding is complete, leave for 48 hours min. to cure Bonding Steps 1. At the marked positions bond wall channels first. Check with level after fitting. 2. Bond floor channels positioned to self-adhesive blocks, add a little silicone inside channel corner, insert the wall-to-floor connector to line up both channels and clean out any excess silicone.
  • Page 5 PROCESS Glass Panel Alignment DIAGRAM 3 Glass Packer Levelling First assess the overall scope of floor channels to level 1. Below Glass Panel A: Fit 2mm packer and select packers under Panel B to level up to corner. 2. Below Glass Panel C: Start at outside corner packer selecting packers across to wall at level. 3.
  • Page 6 PROCESS Glass Bonding Steps DIAGRAM 4 8mm Silicone Bead DIAGRAM 6 Corner Glass Joint When all bonding is complete, leave for 48 hours min. to cure Glass Glass DIAGRAM 5 Packers in Floor Channels only Bonding Panels A & C Apply a continuous bead of silicone on inside of floor and wall channels (Diagram 5) 1.
  • Page 7 6. Repeat tightening process two more times before leaving site to give the gaskets a chance to bed in. 3mm Max 7. Fit seal to bottom of door. CONTACT Freephone: 0508 639 5463 Phone: 09 444 2053 Email: info@newline.co.nz newline.nz...

Table of Contents