2-sided showers and 3-sided alcove doors (9 pages)
Summary of Contents for NewLine Streamline
Page 1
SCREEN INSTALLATION INSTRUCTIONS Parts Included 1. One Aluminum Canister with Polyester Screen (PART 2. Two Rails (PART 3. Two End Caps (PART ) attached to Wall Jamb (PART Tools Required Level Tape Measure Metal Handsaw Caulk Pencil Before Installation • Clean surface. •...
Page 2
PEEL PEEL TAPE TAPE PENCIL LINE RAIL END CAP RAIL END (PART C ) ON CAP ON THE LINE THE LINE NOTE: DO NOT REMOVE PART C UNTIL PART D IS INSTALLED. STEP ONE: Install Canister and Wall Jamb with End Caps 1.
Page 3
RAIL END CAP IMPORTANT: MEASURE OPENING CORRECTLY TO AVOID CUTTING RAILS SHORT. STEP TWO: Install Rails 1. Measure the distance between walls for the UPPER rail , and subtract 2 ". Transfer measurement to rail , and cut to measured length. 2.
Page 4
STEP THREE: Caulk 1. Caulk the exterior perimeter of the STREAMLINE Screen. Allow caulk to dry. ® Enjoy your STREAMLINE ® Screen —The Intelligent Shower Screen! www.newlinebathroom.com • 4 •...
Page 5
(at the discretion of NEWLINE) free of charge to the consumer, provided the failure is reported directly to NEWLINE and an original receipt, showing original purchase from authorized distributor/dealer is presented at the time of claim date.
Need help?
Do you have a question about the Streamline and is the answer not in the manual?
Questions and answers