Figure 16 - Closing the sensor holder
Repeat this procedure for the second measuring channel if applicable.
Once the measuring channel is equipped correctly, the "Sensor Replacement"
window opens where the inserted sensors has to be identified as "New".
After the sensor is inserted, the device needs some time for sensor conditioning.
This time is shown on the display and counts down. During this period it is not
possible to conduct measurements.
4.2.4 Mains
It is essential that the actual mains frequency is set in the main menu/device
settings before measurement.
The device is designed for a mains voltage of 100 to 240 Volt and a
frequency of 50 or 60 Hz. Set the mains frequency in the
main menu/device settings to the correct value for your region.
For further enquiries contact your technical consultant or dealer.
The device is designed for continuous operation. Even in the stand-by state, the
chip sensor and flow system use internal device functions, which are available only
when the device is connected to the mains supply.
Close the sensor holder and press the
latch down on the closed side until it
audibly (click) engages.
17
Need help?
Do you have a question about the Biosen C-Line Clinic and is the answer not in the manual?