Download Print this page
FS IES3220 Series Quick Start Manual

FS IES3220 Series Quick Start Manual

Industrial switches

Advertisement

Available languages

Available languages

Quick Links

IES3220 SERIES INDUSTRIAL
SWITCHES
INDUSTRIELLE SWITCHES DER IES3220 SERIE
SWITCHS INDUSTRIELS DE LA SÉRIE IES3220
IES����シリーズ産業用スイッチ
Quick Start Guide
Quick-Start Anleitung
Guide de Démarrage Rapide
クイックスタートガイド
PW R1
PW R2
Al arm
Di ag
6
5
10 /1 00 /1
00 0B AS
E- T
3
4
1
2
IE S 3 2 2
0 -4 T 2 F
V1.0

Advertisement

loading
Need help?

Need help?

Do you have a question about the IES3220 Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for FS IES3220 Series

  • Page 1 Di ag 10 /1 00 /1 00 0B AS E- T IE S 3 2 2 0 -4 T 2 F IES3220 SERIES INDUSTRIAL SWITCHES INDUSTRIELLE SWITCHES DER IES3220 SERIE SWITCHS INDUSTRIELS DE LA SÉRIE IES3220 IES����シリーズ産業用スイッチ Quick Start Guide V1.0...
  • Page 2 Introduction Thank you for choosing the IES3220 Series Industrial Switches. This guide is designed to familiarize you with the layout of the switches and describes how to deploy them in your network. PW R1 PW R2 Alar m Dia g...
  • Page 3 PW R1 PW R2 Ala rm Dia g 10/ 100 /10 00B ASE -T-P OE+ IE S3 22 0- 8T 4F Po E+ IES3220-8T4F-U Accessory Grounding Cable x1 NOTE: The accessory may vary from illustration, please prevail in kind.
  • Page 4: Hardware Overview

    Hardware Overview Front Panel Ports IES3220-4T2F PWR1 PWR2 Alarm Diag 10/100/1000BASE-T RJ45 IES3220-4T2F IES3220-8T4F PWR1 PWR2 Alarm Diag 10/100/1000BASE-T RJ45 IES3220-8T4F...
  • Page 5 IES3220-8T4F-U PWR1 PWR2 Alarm Diag 10/100/1000BASE-T-POE++ RJ45 IES3220-8T4F-U PoE+ Ports Description RJ45 10/100/1000BASE-T ports for Ethernet connection SFP ports for 100M/1G Gigabit connection Front Panel LEDs IES3220-4T2F PWR1 PWR2 PWR1 PWR2 Alarm Diag Alarm Diag 10/100/1000BASE-T 10/100/1000BASE-T IES3220-4T2F...
  • Page 6 IES3220-8T4F PWR1 PWR2 PWR1 PWR2 Alarm Diag Alarm Diag 10/100/1000BASE-T 10/100/1000BASE-T IES3220-8T4F IES3220-8T4F-U PWR1 PWR2 PWR1 PWR2 Alarm Diag Alarm Diag 10/100/1000BASE-T-POE++ 10/100/1000BASE-T IES3220-8T4F-U PoE+...
  • Page 7 LEDs State Description Solid Green The DC power input is successful. PWR1/PWR2 The DC power input is abnormal or not supplied. The abnormalities occur in the data input Solid Red interface. Alarm The device is running normally. The self-inspection of the system fails, or a Solid Red system operation alarm occurs.
  • Page 8 Top Panel Ports IES3220-4T2F PWR2 PWR1 24-48V ; 0.7A 24-48V 0.7A PWR2 PWR1 1 2 3 4 CONSOLE Grounding Point CONSOLE IES3220-8T4F PWR2 PWR1 ; 0.7A 0.7A 24-48V 24-48V PWR2 PWR1 1 2 3 4 CONSOLE Grounding Point CONSOLE IES3220-8T4F-U PWR2 PWR1 ;3.6A...
  • Page 9: Dip Switch

    Ports Description Alarm input connection Alarm output connection PWR1 DC power receptacle 1 PWR2 DC power receptacle 2 For connecting to the serial port of the local terminal (which can CONSOLE be a PC) and running the terminal simulation program on the terminal Grounding Point For grounding...
  • Page 10: Installation Requirements

    DIP Switch Description Enables or disables ow control on all ports. Enables or disables broadcast-suppression on all ports. Reserved. (IES3220-4T2F) Enables or disables RRPP on ports 5 and 6. (IES3220-4T2F) (IES3220-8T4F/ Enables or disables the link aggregation on ports 9 and 10. IES3220-8T4F-U) (IES3220-8T4F/ Enables or disables RRPP on ports 11 and 12.
  • Page 11: Site Environment

    Site Environment Be sure that there are some spaces at the inlet and outlet of the switch for heat dissipation of the switch. Be sure that the rail is rm enough to support the weight of the switch and its accessories for installation.
  • Page 12: Grounding The Switch

    Grounding the Switch V - V i t y 2 4 - 4 8 A c t i v ; 0 .7 A M b p i t y A c t i v 1 0 0 0 b p s 2 4 - 4 8 0 0 M 1 0 / 1...
  • Page 13 Connecting the DO/DI Port Cable 1. Strip o the PVC interface cable protector and the insulating layer of the two positive and negative power cables with 7mm bore wire, and the other end of the cables are the same. 2. Plug the DI and DO cables into the holes of the phoenix connector. 3.
  • Page 14: Connecting The Sfp Ports

    Connecting the RJ45 Ports PW R1 PW R2 Ala rm Dia g 10 /1 00 /1 00 0B AS E- T IE S 32 20 -4 T 2F 1. Connect one end of an Ethernet cable to the RJ45 port of a camera, outdoor AP, computer, or other network device.
  • Page 15: Connecting The Console Port

    PW R1 PW R2 Al ar m Di ag Connecting the Console Port 10 /1 00 /1 00 0B AS E- T IE S 3 2 2 0 -4 T 2 F 1. Insert the RJ45 connector of the console cable into the RJ45 console port on the switch. 2.
  • Page 16 2. Plug the one end of the DC power cord into the holes on the phoenix connector. 3. Tighten the two screws on the top of the phoenix connector with a athead screwdriver. V - V 2 4 - 4 8 i t y A c t i v ;...
  • Page 17 Con guring the Switch Con guring the Switch Using the Web-based Interface Step 1: Connect the computer to the Ethernet port of the switch using the network cable. Step 2: Set the IP address of the computer to 192.168.1.x ("x" is any number from 2 to 254) i v i t y A c t s h =...
  • Page 18: Troubleshooting

    Con guring the Switch Using the Console Port Step 1: Connect a computer to the console port of the switch using the console cable. Step 2: Start the terminal simulation software, such as HyperTerminal on the computer. Step 3: Set the parameters of the HyperTerminal: Baud rate to 115200, Data bits to 8, Parity to None, and Stop bits to 1.
  • Page 19: Online Resources

    Product Warranty FS ensures our customers that for any damage or faulty items due to our workmanship, we will o er a free return within 30 days from the day you receive your goods. This excludes any custom-made items or tailored solutions.
  • Page 20 Einführung Vielen Dank, dass Sie sich für die Industrielle Switches der IES3220 Serie entschieden haben. Diese Anleitung soll Sie mit dem Aufbau der Switches vertraut machen und beschreibt, wie sie zu montieren sind. PW R1 PW R2 Alar m Dia g 10/ 100 /10 00B AS E-T IE S3 22...
  • Page 21 PW R1 PW R2 Ala rm Dia g 10/ 100 /10 00B ASE -T-P OE+ IE S3 22 0- 8T 4F Po E+ IES3220-8T4F-U Zubehör Erdungskabel x1 HINWEIS: Bitte beachten Sie, dass das Zubehör von der Abbildung abweichen kann.
  • Page 22 Hardware-Übersicht Port an der Vorderseite IES3220-4T2F PWR1 PWR2 Alarm Diag 10/100/1000BASE-T RJ45 IES3220-4T2F IES3220-8T4F PWR1 PWR2 Alarm Diag 10/100/1000BASE-T RJ45 IES3220-8T4F...
  • Page 23 IES3220-8T4F-U PWR1 PWR2 Alarm Diag 10/100/1000BASE-T-POE++ RJ45 IES3220-8T4F-U PoE+ Ports Beschreibung RJ45 10/100/1000BASE-T-Ports für Ethernet-Verbindung SFP-Ports für 100M/1G-Gigabit-Verbindung LEDs an der Voderseite IES3220-4T2F PWR1 PWR2 PWR1 PWR2 Alarm Diag Alarm Diag 10/100/1000BASE-T 10/100/1000BASE-T IES3220-4T2F...
  • Page 24 IES3220-8T4F PWR1 PWR2 PWR1 PWR2 Alarm Diag Alarm Diag 10/100/1000BASE-T 10/100/1000BASE-T IES3220-8T4F IES3220-8T4F-U PWR1 PWR2 PWR1 PWR2 Alarm Diag Alarm Diag 10/100/1000BASE-T-POE++ 10/100/1000BASE-T IES3220-8T4F-U PoE+...
  • Page 25 LEDs Zustand Beschreibung Durchgehend grün Die AC-Stromversorgung ist normal. PWR1/PWR2 Die AC-Stromversorgung ist nicht normal oder nicht vorhanden. Die Anomalien treten in der Durchgehend rot Dateneingabeschnittstelle auf. Alarm Das Gerät läuft normal. Die Selbstprüfung des Systems schlägt Durchgehend rot fehl oder es tritt ein Systembetriebsalarm auf.
  • Page 26 Panel-Anschlüsse auf der Oberseite IES3220-4T2F PWR2 PWR1 24-48V ; 0.7A 24-48V 0.7A PWR2 PWR1 1 2 3 4 CONSOLE Grounding Point CONSOLE IES3220-8T4F PWR2 PWR1 ; 0.7A 0.7A 24-48V 24-48V PWR2 PWR1 1 2 3 4 CONSOLE Grounding Point CONSOLE IES3220-8T4F-U PWR2 PWR1...
  • Page 27 Ports Beschreibung Alarmeingangsanschluss Alarmausgangsanschluss PWR1 Gleichstromanschluss 1 PWR2 Gleichstromanschluss 2 Zum Anschließen an den seriellen Port des lokalen Terminals (bei CONSOLE dem es sich um einen PC handeln kann) und zum Ausführen des Terminalsimulationsprogramms auf dem Terminal Grounding Point Für die Erdung Tasten auf der Oberseite IES3220-4T2F ;...
  • Page 28 Tasten Beschreibung Aktiviert oder deaktiviert die Flusskontrolle an allen Ports. Aktiviert oder deaktiviert die Broadcast-Unterdrückung an allen Ports. Reserviert. (IES3220-4T2F) Aktiviert oder deaktiviert RRPP an den Ports 5 und 6. (IES3220-4T2F) Aktiviert oder deaktiviert die Link-Aggregation an den Ports 9 und (IES3220-8T4F/ IES3220-8T4F-U) (IES3220-8T4F/...
  • Page 29: Montage Des Switches

    Betriebsumgebung Achten Sie darauf, dass am Ein- und Ausgang des Switches genügend Platz für die Wärmeableitung vorhanden ist. Vergewissern Sie sich, dass die Schiene stabil genug ist, um das Gewicht des Switches und seines Zubehörs bei der Installation zu tragen. Achten Sie darauf, dass die Schiene und der Switch gut geerdet sind.
  • Page 30 Erdung des Switches V - V i t y 2 4 - 4 8 A c t i v ; 0 .7 A M b p i t y A c t i v 1 0 0 0 b p s 2 4 - 4 8 0 0 M 1 0 / 1...
  • Page 31: Anschließen Der Stromversorgung

    Anschließen der Stromversorgung 1. Entfernen Sie den PVC-Schnittstellenkabelschutz und die Isolierschicht der beiden positiven und negativen Stromkabel mit 7-mm-Bohrdraht. Das andere Ende der Kabel ist dasselbe. 2. Stecken Sie die DI- und DO-Kabel in die Löcher des Phoenix-Steckers. 3. Ziehen Sie die beiden Schrauben oben am Phoenix-Anschluss mit einem Schlitzschraubendreher im Uhrzeigersinn fest.
  • Page 32 Anschließen der RJ45-Ports PW R1 PW R2 Ala rm Dia g 10 /1 00 /1 00 0B AS E- T IE S 32 20 -4 T 2F 1. Verbinden Sie ein Ende eines Ethernet-Kabels mit dem RJ45-Port einer Kamera, eines APs für Außenbereiche, eines Computers oder eines anderen Netzwerkgeräts.
  • Page 33 PW R1 PW R2 Al ar m Di ag Anschließen des Konsolenports 10 /1 00 /1 00 0B AS E- T IE S 3 2 2 0 -4 T 2 F 1. Stecken Sie den RJ45-Stecker des Konsolenkabels in den RJ45-Konsolenanschluss am Switch.
  • Page 34 2. Stecken Sie das eine Ende des Gleichstromkabels in die Löcher des Phoenix- Anschlusses. 3. Ziehen Sie die beiden Schrauben an der Oberseite des phoenix-Anschlusses mit einem Schlitzschraubendreher fest. V - V 2 4 - 4 8 i t y A c t i v ;...
  • Page 35 Kon gurieren des Switches Kon gurieren des Switch über die webbasierte Schnittstelle Schritt 1: Verbinden Sie den Computer über das Netzwerkkabel mit dem Ethernet-Port des Switches. Schritt 2: Stellen Sie die IP-Adresse des Computers auf 192.168.1.x ein („x“ ist eine beliebige Zahl von 2 bis 254) Schritt 3: Ö...
  • Page 36: Fehlerbehebung

    Kon gurieren des Switch über den Konsolenport Schritt 1: Schließen Sie einen Computer über das Konsolenkabel an den Konsolenport des Switches an. Schritt 2: Starten Sie die Terminalsimulationssoftware, z. B. HyperTerminal, auf dem Computer. Schritt 3: Stellen Sie die Parameter des HyperTerminal ein: Baudrate auf 115200, Datenbits auf 8, Parität auf Keine und Stoppbits auf 1.
  • Page 37 Kontakt https://www.fs.com/de/contact_us.html Produktgarantie FS garantiert seinen Kunden, dass wir bei Schäden oder fehlerhaften Artikeln, die auf unsere Verarbeitung zurückzuführen sind, eine kostenlose Rückgabe innerhalb von 30 Tagen nach Erhalt der Ware anbieten. Dies gilt nicht für Sonderanfertigungen oder maßgeschneiderte Lösungen.
  • Page 38 Introduction Nous vous remercions d'avoir choisi le switch industriel de la série IES3220. Ce guide est conçu pour vous familiariser avec la con guration du switch et décrit comment procéder à son déploiement. PW R1 PW R2 Alar m Dia g 10/ 100 /10 00B AS E-T IE S3 22...
  • Page 39 PW R1 PW R2 Ala rm Dia g 10/ 100 /10 00B ASE -T-P OE+ IE S3 22 0- 8T 4F Po E+ IES3220-8T4F-U Accessoires Câble de Mise à la Terre x1 NOTE : Les accessoires peuvent varier par rapport à l'illustration, veuillez en tenir compte.
  • Page 40: Présentation Du Matériel

    Présentation du Matériel Ports du Panneau Frontal IES3220-4T2F PWR1 PWR2 Alarm Diag 10/100/1000BASE-T RJ45 IES3220-4T2F IES3220-8T4F PWR1 PWR2 Alarm Diag 10/100/1000BASE-T RJ45 IES3220-8T4F...
  • Page 41 IES3220-8T4F-U PWR1 PWR2 Alarm Diag 10/100/1000BASE-T-POE++ RJ45 IES3220-8T4F-U PoE+ Ports Description RJ45 Ports 10/100/1000BASE-T pour connexion Ethernet Ports SFP pour connexion Gigabit 100M/1G LED du Panneau Frontal IES3220-4T2F PWR1 PWR2 PWR1 PWR2 Alarm Diag Alarm Diag 10/100/1000BASE-T 10/100/1000BASE-T IES3220-4T2F...
  • Page 42 IES3220-8T4F PWR1 PWR2 PWR1 PWR2 Alarm Diag Alarm Diag 10/100/1000BASE-T 10/100/1000BASE-T IES3220-8T4F IES3220-8T4F-U PWR1 PWR2 PWR1 PWR2 Alarm Diag Alarm Diag 10/100/1000BASE-T-POE++ 10/100/1000BASE-T IES3220-8T4F-U PoE+...
  • Page 43 Description État L'alimentation en courant continu (DC) est Vert réussie. PWR1/PWR2 L'alimentation en courant continu (DC) ne Éteint fonctionne pas correctement ou n'est pas fournie. L'interface d'entrée des données présente Rouge une anomalie. Alarm Éteint L'appareil fonctionne normalement. L'auto-inspection du système a échoué ou Rouge une alarme concernant le fonctionnement du système s'est déclenchée.
  • Page 44 Ports du Panneau Supérieur IES3220-4T2F PWR2 PWR1 24-48V ; 0.7A 24-48V 0.7A PWR2 PWR1 1 2 3 4 CONSOLE Grounding Point CONSOLE IES3220-8T4F PWR2 PWR1 ; 0.7A 0.7A 24-48V 24-48V PWR2 PWR1 1 2 3 4 CONSOLE Grounding Point CONSOLE IES3220-8T4F-U PWR2 PWR1...
  • Page 45 Ports Description Connexion d'entrée d'alarme Connexion de sortie d'alarme PWR1 Prise d'alimentation CC 1 PWR2 Prise d'alimentation CC 2 Pour la connexion au port série du terminal local (qui peut être un CONSOLE PC) et l'exécution du programme de simulation de terminal sur le terminal.
  • Page 46: Conditions D'installation

    Interrupteur DIP Description Active ou désactive le contrôle de ux sur tous les ports. Active ou désactive la suppression de la di usion sur tous les ports. Réservé. (IES3220-4T2F) Active ou désactive le RRPP sur les ports 5 et 6. (IES3220-4T2F) (IES3220-8T4F/ Active ou désactive l'agrégation de liens sur les ports 9 et 10.
  • Page 47: Site D'installation

    Site d'Installation Veillez à ce qu'il y ait un espace su sant au niveau de l'entrée et de la sortie du switch pour permettre la dissipation de la chaleur. Assurez-vous que le rail est su samment solide pour supporter le poids du switch et de ses accessoires lors de l'installation.
  • Page 48 Mise à la Terre du Switch V - V i t y 2 4 - 4 8 A c t i v ; 0 .7 A M b p i t y A c t i v 1 0 0 0 b p s 2 4 - 4 8 0 0 M...
  • Page 49 Connexion des Câbles des Ports DO/DI 1. Enlevez le protecteur de câble d'interface en PVC et la couche isolante des deux câbles d'alimentation positif et négatif avec un l de 7 mm de diamètre, et l'autre extrémité des câbles est la même. 2.
  • Page 50 Connexion des Ports RJ45 PW R1 PW R2 Ala rm Dia g 10 /1 00 /1 00 0B AS E- T IE S 32 20 -4 T 2F 1. Connectez une extrémité d'un câble Ethernet au port RJ45 d'une caméra, un point d'accès extérieur, un ordinateur ou tout autre périphérique réseau.
  • Page 51: Branchement De L'alimentation

    PW R1 PW R2 Al ar m Di ag Connexion du Port de Console 10 /1 00 /1 00 0B AS E- T IE S 3 2 2 0 -4 T 2 F 1. Insérez le connecteur RJ45 du câble de console dans le port de console RJ45 du switch. 2.
  • Page 52 2. Branchez l'une des extrémités du cordon d'alimentation DC dans les trous du connecteur phoenix. 3. Serrez les deux vis situées sur le dessus du connecteur phoenix à l'aide d'un tournevis à tête plate. Serrez les deux vis situées sur le dessus du connecteur phoenix à l'aide d'un tournevis à...
  • Page 53 Con guration du Switch Con guration du Switch à l'aide de l'interface Web Étape 1 : Connectez l'ordinateur au port Ethernet du commutateur à l'aide du câble réseau. Étape 2 : Dé nissez l'adresse IP de l'ordinateur sur 192.168.1.x (""x"" est un nombre quelconque compris entre 2 et 254).
  • Page 54: Dépannage

    Con guration du Switch à l'aide du Port Console Étape 1 : Connectez un ordinateur au port console du switch à l'aide du câble de console. Étape 2 : Lancez le logiciel de simulation HyperTerminal sur l'ordinateur. Étape 3 : Dé nissez les paramètres de l'HyperTerminal : Baud rate à 115200, Data bits à 8, Parity à...
  • Page 55: Garantie Du Produit

    Garantie du Produit FS garantit à ses clients que tout article endommagé ou défectueux en raison de sa fabrication pourra être retourné gratuitement dans un délai de 30 jours à compter de la date de réception de la marchandise. Cette garantie ne s'applique pas aux articles fabriqués sur mesure ou aux solutions personnalisées.
  • Page 56 イントロダクション この度は、IES����シリーズ産業用スイッチをお選び頂き、誠にありがとうございます。 このガイドは、スイッチのレイアウトを理解し、ネットワークにスイッチを導入する方法 を説明するためのものです。 PW R1 PW R2 Alar m Dia g 10/ 100 /10 00B AS E-T IE S3 22 0- 4T 2F IES����-�T�F PWR 1 PWR 2 Alar m Diag 10 /10 0/1 00 0B AS IE S3 22 0- 8T 4F IES����-�T�F...
  • Page 57 PW R1 PW R2 Ala rm Dia g 10/ 100 /10 00B ASE -T-P OE+ IE S3 22 0- 8T 4F Po E+ IES����-�T�F-U アクセサリー 接地ケーブルx� 注: アクセサリーはイラストと異なる場合がありますので、ご注意ください。...
  • Page 58 ハードウエア概要 フロントパネルポート IES����-�T�F PWR1 PWR2 Alarm Diag 10/100/1000BASE-T RJ�� IES3220-4T2F IES����-�T�F PWR1 PWR2 Alarm Diag 10/100/1000BASE-T RJ�� IES3220-8T4F...
  • Page 59 IES����-�T�F-U PWR1 PWR2 Alarm Diag 10/100/1000BASE-T-POE++ RJ�� IES3220-8T4F-U PoE+ ポート 説明 RJ�� イーサネット接続用��/���/����BASE-Tポート ���M/�Gギガビット接続用SFPポート フロントパネルLED IES����-�T�F PWR� PWR� PWR1 PWR2 Alarm Diag Alarm Diag 10/100/1000BASE-T ��/���/����BASE-T IES3220-4T2F...
  • Page 60 IES����-�T�F PWR� PWR� Alarm Diag PWR1 PWR2 Alarm Diag 10/100/1000BASE-T ��/���/����BASE-T IES3220-8T4F IES����-�T�F-U PWR� PWR� Alarm Diag PWR1 PWR2 Alarm Diag 10/100/1000BASE-T-POE++ ��/���/����BASE-T IES3220-8T4F-U PoE+...
  • Page 61 状態 説明 点灯(緑) DC電源の入力は成功です。 PWR�/PWR� DC電源入力が異常か、または供給されていませ 消灯 ん。 データ入力インターフェースに異常が発 点灯(赤) 生しています。 Alarm 消灯 デバイスは正常に動作しています。 システムの自己点検に失敗した、またはシステ 点灯(赤) ム作動アラームが発生しました。 Diag システムの自己点検に成功しました。デバイス 消灯 は正常に動作しています。 点灯(緑) ポートが接続されています。 点減(緑) データは受信中または送信中です。 消灯 ポートが接続されていません。 点灯 ポートは���� Mbpsで接続されています。 緑色 点減 データは���� Mbpsで送受信されています。 ��/���/����BASE-T 消灯 ���� Mbpsのリンクが確立されていません。 ( IES����-�T�F / 点灯...
  • Page 62 上部パネルポート IES����-�T�F PWR� PWR� 24-48V ; 0.7A 24-48V 0.7A PWR2 PWR1 1 2 3 4 CONSOLE Grounding Point CONSOLE IES����-�T�F PWR� PWR� ; 0.7A 0.7A 24-48V 24-48V PWR2 PWR1 1 2 3 4 CONSOLE Grounding Point CONSOLE IES����-�T�F-U PWR� PWR� ;3.6A ;3.6A 53-57V...
  • Page 63 ポート 説明 アラーム入力接続 アラーム出力接続 PWR� DC電源コンセント� PWR� DC電源コンセント� ローカル端末(PCでも可能)のシリアルポートに接続し、端末上で CONSOLE 端末シミュレーションプログラムを実行します。 接地点 接地用 上部パネルボタン IES����-�T�F ; 0.7A 0.7A 24-48V 24-48V PWR2 PWR1 1 2 3 4 CONSOLE DIP Switch IES����-�T�F ; 0.7A 0.7A 24-48V 24-48V PWR2 PWR1 1 2 3 4 CONSOLE DIP Switch IES����-�T�F-U...
  • Page 64 ボタン 説明 � すべてのポートのフロー制御機能をオン/オフにします。 � 全ポートのブロードキャスト抑制機能をオン/オフにします。 � 予備用。 (IES����-�T�F) � ポート�と�のRRPP自動設定機能をオン/オフにします。 (IES����-�T�F) � (IES����-�T�F/ ポート�と��のリンクアグリゲーション機能をオン/オフにします。 IES����-�T�F-U) � (IES����-�T�F/ ポート��と��のRRPP自動設定機能をオン/オフにします。 IES����-�T�F-U) インストール要件 インストールを開始する前に、以下のことを確認してください。 プラスドライバーとマイナスドライバー。 ESDリストストラップ。 ラジオペンチ、斜めペンチ、圧着ペンチ。 スパナレンチ。 注意事項 デバイスを掃除する前に、電源を外す必要があります。デバイスを液体で掃除しない でください。 危険な状況を避けるために、スイッチが水平で安定していることを確認してください。 スイッチは正しい電圧下で正常に動作するため、動作電圧がスイッチにマークされて いる電圧と一致していることを確認してください。 インターフェースボードを交換する時は、静電気によるベニヤの損傷を防ぐために、 ESDリストストラップを着用する必要があります。 光による損傷を避けるため、デバイスの動作中は光インターフェースを直接見ないでく ださい。 感電の危険を軽減するため、スイッチが動作しているときは、スイッチの筐体を取り外 さないでください。また、電源が入っていない場合でも、勝手に取り外さないでくださ い。...
  • Page 65 設置環境 スイッチの放熱のため、スイッチの入口と出口にはある程度のスペースを確保してく ださい。 レールがスイッチとそのアクセサリーの設置重量を支える。に十分な固さであることを 確認してください。 設置場所は十分に換気する必要があります。 設置場所の温度と湿度は適度な範囲に保ってください。 ほこりの多い環境に装置を設置しないでください。 機器室は、SO₂、H₂S、NH₃とCl₂などの有害ガスの侵入から保護する必要があります。 スイッチが動作する場所は、強力な無線送信所、レーダー送信所、高周波および大電 流機器から離してください。 スイッチの取り付け DINレール取り付け �. DINユニット上部のバネをDINレールに当てます。 �. スイッチを下向きに押し、DINユニットの底部をDINレールにはめ込みます。...
  • Page 66 スイッチの接地 V - V i t y 2 4 - 4 8 A c t i v ; 0 .7 A M b p i t y A c t i v 1 0 0 0 b p s 2 4 - 4 8 0 0 M 1 0 / 1 0 .7 A...
  • Page 67 DO/DIポートケーブルの接続 �. プラスとマイナスの�本の電源ケーブルのPVCインターフェイスケーブルプロテクターと 絶縁層を�mmボアワイヤーで剥がし、ケーブルの他の端も同じにします。 �. DIとDOケーブルをフェニックスコネクタの穴に差し込みます。 �. フェニックスコネクタ上部のネジ�本をマイナスドライバーで時計回りに締めます。 V - V i t y 2 4 - 4 8 A c t i v ; 0 .7 A M b p i t y A c t i v 1 0 0 0 b p s 2 4 - 4 8 0 0 M...
  • Page 68 RJ��ポートの接続 PW R1 PW R2 Ala rm Dia g 10 /1 00 /1 00 0B AS E- T IE S 32 20 -4 T 2F �. カメラ、屋外AP、コンピューター、その他のネットワークデバイスのRJ��ポートにイ ーサネットケーブルを接続します。 �. イーサネットケーブルのもう一方の端を、スイッチのRJ��ポートに接続します。 SFPポートの接続 PW R1 PW R2 Ala rm Dia g 10 /1 00 /1 00 0B AS E- T IE S 32 20...
  • Page 69 PW R1 PW R2 Al ar m Di ag コンソールポートの接続 10 /1 00 /1 00 0B AS E- T IE S 3 2 2 0 -4 T 2 F �.コンソールケーブルのRJ��コネクタをスイッチのRJ��コンソールポートに差し込みます。 �.コンソールケーブルのもう一方の端をコンピュータのシリアルポートに接続します。 電源の接続 V - V 2 4 - 4 8 i t y A c t i v ;...
  • Page 70 �. DC電源コードの一端をフェニックスコネクタの穴に差し込みます。 �. フェニックスコネクタ上部のネジ�本をマイナスドライバーで締めます。 V - V i t y 2 4 - 4 8 A c t i v ; 0 .7 A M b p i t y A c t i v 1 0 0 0 b p s 2 4 - 4 8 0 0 M 1 0 / 1...
  • Page 71 スイッチの設定 Webベースインタフェイスを使用したスイッチの設定 ステップ�:ネットワークケーブルを使用して、コンピュータをスイッチのイーサネットポ ートに接続します。 ステップ�:コンピュータのIPアドレスを���.���.�.xに設定します。 (「x」は�から���ま での任意の数字です)。 ステップ�:ブラウザを開き、http://���.���.�.�と入力し、デフォルトのユーザー名とパ i v i t y A c t s h = , F l a b p s 0 0 M 0 / 1 スワードであるadmin/adminを入力します。 n = 1 ステップ�:「Login」をクリックして、Webベースの構成ページを表示します。...
  • Page 72 コンソールポートを使用したスイッチの設定 ステップ�:コンソールケーブルを使用して、コンピュータをスイッチのコンソールポート に接続します。 ステップ�:パソコンでHyperTerminalなどの端末シミュレーションソフトを起動します。 ステップ�:HyperTerminalのパラメータを以下のように設定します。ボーレート (Baud rate)����、データビット(Data bits)�、パリティ(Parity)なし(None)、 ストップビット(Stop bits)�、フロー制御(flow control)なしです。 Quick Connect Protocol: Serial The port may be manually entered or selected from the list. Port: COM5 USB Serial Port 115200 Baud rate: Flow Control DTR/DSR Data bits: RTS/CTS Parity: None XON/XOFF...
  • Page 73 設定システムのトラブルシューティング �. 設定ターミナルに何も表示されない場合は、電源が正常かどうか、コンソールポートの ケーブルが正しく接続されているかどうかを確認してください。 �. 設定システムでハッシュが表示される場合は、端末(スーパー端末など)のパラメータ設 定を確認してください:ボーレート:������、データビット:�、パリティ:なし、スト ップビット:�、フロー制御:NA(当該なし)。 オンラインリソース ダウンロード https://www.fs.com/jp/products_support.html ヘルプセンター https://www.fs.com/jp/service/fs_support.html お問い合わせ https://www.fs.com/jp/contact_us.html 製品保証 FSでは、弊社の製造技術による破損や不良品については、商品をお受け取りになった日か ら��日以内であれば、無料で返品を承ります。ただし、これにはカスタム製品やオーダー メイドは含まれません。 保証:この製品は、材料または製造上の欠陥に対して�年間の限定保証を提供し ます。保証の詳細については、次のサイトでご確認ください: https://www.fs.com/jp/policies/warranty.html 返品:返品したい場合は、返品方法に関する情報が次のサイトにご覧ください: https://www.fs.com/jp/policies/day_return_policy.html...
  • Page 74: Compliance Information

    2011/65/EU und (EU)2015/863 konform ist. Eine Kopie der EU-Konformitätserklärung nden Sie unter www.fs.com/de/company/quality_control.html. FS.COM GmbH déclare par la présente que ce dispositif est conforme à la Directive 2014/30/EU, 2011/65/EU et (EU)2015/863. Une copie de la Déclaration de Conformité de l'UE est disponible à l'adresse suivante https://www.fs.com/fr/company/quality_control.html.
  • Page 75 UKCA Hereby, FS.COM Innovation Ltd declares that this device is in compliance with the Directive SI 2016 No. 1091and SI 2012 NO. 3032. FS.COM INNOVATION LTD Unit 8, Urban Express Park, Union Way, Aston, Birmingham, B6 7FH, United Kingdom ISED...
  • Page 76 Do not dispose of WEEE as unsorted municipal wasteand have to collect such WEEE separately. Q.C. PASSED Copyright © 2023 FS.COM All Rights Reserved.

This manual is also suitable for:

Ies3220-4t2fIes3220-8t4fIes3220-8t4f-u