4 Carefully slide the PSU all the way into the power supply bay (see
the latch snaps into place.
CAUTION
Do not slam the PSU into the switch.
Figure 82: Installing a PSU
5 To install a second PSU, repeat steps
NOTE
If PSUs are not installed in both power supply bays, be sure to install a cover over the unoccupied bay. Unoccupied
bays must always be covered to maintain proper system ventilation and EMI levels.
6 Connect an appropriate AC power cord to the power input socket; connect the other end of the
power cord to a grounded AC power outlet.
WARNING!
Always be sure that the source outlet is properly grounded before plugging the AC power cord into the AC PSU.

Installing a Summit X650 DC Power Supply

CAUTION
Make sure that the Summit X650 DC PSU circuit is not overloaded. Use proper over-current protection, such as a
circuit-breaker, to prevent over-current conditions. You may use up to a 30-Amp breaker.
To install the Summit X650 DC PSU, perform the following tasks in the order listed:
1 Prepare the power cables and ground cable by attaching the provided connection lugs to the cables
(see next section).
2 Insert the PSU into the Summit X650 series switch (see
3 Connect the ground (see
Summit Family Switches Hardware Installation Guide
3
and 4.
"Connecting the Ground Cable" on page
Figure
82). Push the PSU in until
SH_089
"Installing the Power Supply" on page
114).
113.